Laserfiche WebLink
35 - <br /> <br /> Table 3 <br />PROGRAM COSTS FOR RESOURCE RECOVERY FACILITIES <br /> <br /> Revenue <br /> from Average <br />Capital Annual Energy or Net Costs <br />Costs Costs Materials (Savings) <br />($ millions) (S/ton) IS/ton) (S/ton) <br /> <br />Facilities Less Than 100 TPD <br /> <br />Modular Inciner- <br /> ation 1.3 <br /> <br />14.5 <br /> <br />9.0 <br /> <br />5.5 <br /> <br />Dano Composting <br /> Drum 0.5 <br /> <br />9.7 <br /> <br />8.0 <br /> <br />1.7 <br /> <br />~Facilities 100 to 500 TPD <br /> <br />Waterwall Incin- <br /> eration <br /> <br />RDF <br /> <br />17.0 29.0 18.0 11.0 <br />8.8 20.0 8.0 12.0 <br /> <br />16.8 34.0 21.4 12.6 <br />1.6 6.0 8.0 (2.0) <br /> <br />Dedicated <br /> Boilers <br /> <br />Dano Composting <br /> Drum <br /> <br />Facilities Over 500 TPD <br /> <br />Waterwall Incin- <br /> eration 31.0 25.0 18.0 <br /> <br />RDF 17.0 17.0 8.0 <br /> <br />Dedicated <br />Boilers 32.0 30.0 21.4 <br /> <br />Dano Composting <br /> Drum 4.3 5.9 8.0 <br /> <br />Source: Minnesota Pollution Control Agency, 1979 <br /> <br /> 7.0 <br /> <br /> 9.0 <br /> <br /> 8.6 <br /> <br />(2.1) <br /> <br /> <br />