My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/28/1980
Ramsey
>
Public
>
Agendas
>
Council
>
1980
>
Agenda - Council - 10/28/1980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 2:07:20 PM
Creation date
2/28/2006 11:56:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/28/1980
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
257
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pursuant to due call and notice thereof, the Ramsey City Council held a <br />public hearing regarding Street Improvement (Countryside Estates #80 -15) <br />on September 16, 1980, at the Ramsey Municipal Center, 15153 Nowthen Blvd. N.W., <br />Ramsey, Minnesota 55303. <br />Members Present: Mayor Gamec <br />Councilman Sorteberg <br />Councilman Michelson <br />Councilman Cox <br />PUBLIC HEARING <br />City of Ramsey <br />Anoka County <br />State of Minnesota <br />Members Absent: Councilman Reimann <br />Mayor Gamec called the meeting to order at 9:00 P.M. <br />Mayor Gamec said this hearing was on whether to blacktop or put in Class V <br />without blacktopping of Countryside Estates development. <br />City Engineer Raatikka said it is proposed to grade the streets, install <br />Class V gravel, pave the streets and restore the boulevards. He said the <br />proposed street section is a rural type 24' wide street. He said the street <br />section proposed consists of a 3" gravel base with a 11" bituminous surface. <br />City Engineer Raatikka said the estimated costs of the project are $85,000 <br />for bituminous surfacing, $39,000 for Class V Gravel, $16,500 for Grading and <br />$20,700 for restoration and culvert installation. $161,200 is the estimated <br />construction cost, plus contingencies engineering B administrative costs of <br />$40,300 for a total estimated cost for street improvement of $201,500. <br />It is proposed to assess the cost on a unit basis. The cost is divided between <br />109 units for a total of $1,848.62 per unit. At loo interest for 10 years, <br />the annual unit cost is $300.96. <br />The cost of the project could be reduced by $106,250 if the bituminous surfacing <br />was deleted. Therefore, the cost excluding bituminous would be $95,250. <br />That cost divided between 109 units would come to a total of $873.85 per unit. <br />At 10% interst for 10 years, the annual unit cost would come to $142.26. <br />City Engineer Raatikka explained it will be up to the individual owners to <br />take care of their own driveways, with the exception of a one -foot apron which <br />would be provided on all driveways to protect the edge of the pavements. <br />He said as far as scheduling of this project, he recommended that this project <br />be bid as soon as possible this fall so it could be installed this fall with <br />restoration to be done next spring. <br />Mayor Gamec said Country Side Estates is in what the city considered a rural <br />service area and the city is not looking at putting sewer & water in this area. <br />PUBLIC HEARING <br />September 16, 1980 <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.