Laserfiche WebLink
CC Regular Session <br />Meeting Date: 03/ 14/2023 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #23-052 Accepting Municipal Utility Testing Proposals for Hy-10 Ramsey Street <br />Reconstruction, Improvement Project #23-12 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-052 accepting municipal utility testing proposals for Hy-10 <br />Ramsey Street Reconstruction, Improvement Project #23 -12. <br />Background: <br />On November 25, 2022, the Ramsey City Council adopted Resolution #21-349, authorizing funding and ordering <br />engineering services for West Armstrong Redevelopment Area (Plans, Specs and Feasibility Update). Testing of <br />existing municipal utilities, which includes sanitary sewer, storm sewer, and watermain, is standard practice <br />when designing street reconstruction projects because newly paved streets in Ramsey are anticipated to have a <br />60-year life span, assuming proactive maintenance. Identifying damaged or failing municipal utilities under <br />streets before they are reconstructed allows the required repair or replacement work to be completed as part of the <br />street reconstruction project, before the new pavement is placed, preventing costly pavement repairs after the fact. <br />Utilities testing consists of first cleaning the pipe with a water fetter, then using a camera to televise the inside of <br />sewer pipes (sanitary and storm). Sound enhancing equipment is used to listen for leaks in watermain between <br />hydrants and valves. Staff does not have the equipment needed to complete this work in-house, Public Works <br />Staff does not have the staff hours to clean the sewer pipes in advance of being televised. <br />Pipe Televising Quotes — Sanitary and Storm Sewer <br />Televising sewer pipes informs Staff of the conditions of the pipes, and locates existing damage, if present. This <br />allows Staff to include the required repair or replacement work for any damaged pipes into the street <br />reconstruction plans, which is more cost effective than doing repairs as standalone projects, or as change orders <br />during the reconstruction project. <br />Staff requested proposals from four contractors known to perform this work. Proposals were received from two of <br />the contractors, which are tabulated below. <br />Contractor Total Quote <br />-Sewer, Inc. $ 17,970.09 <br />o-Klean, LLC S 91,610.00 <br />F <br />i <br />Visu-Swer, Inc. submitted the lowest responsible quotes, based on the submitted quotes, Staff recommends <br />accepting the proposals for Hy-10 televising from Visu-Sewer, Inc. <br />The Contractor is required to complete their work by Friday, April 14, 2023. <br />Leak Testing Quotes — Watermain <br />Leak testing watermain informs Staff of any leaks in the municipal watermain system within the project area. For <br />the same reasons noted earlier, if a leak is discovered the repair work will be completed as part of the <br />