Laserfiche WebLink
OBOLTON <br />Real People. Real Solutions. <br />March 8, 2023 <br />Mr. Bruce Westby, P.E. <br />City Engineer / Public Works Director <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: HY-10 Ramsey Improvements— Additional Services <br />City Project 23-12 <br />Dear Mr. Westby: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to assist the City with the West Armstrong Redevelopment Area <br />Improvement project. Our scope and fee letter was originally prepared in the fall of 2021 based on our <br />conversations, along with a review of previously prepared documents associated with the project. <br />Bolton & Menk was originally contracted to update the previously prepared feasibility report (prepared by <br />the City) and complete plans and specifications for Ferret Street from 146' Avenue to Bunker Lake <br />Boulevard. The previous feasibility report considered reclamation of the existing rural section roadway <br />and terminating Ferret Street in a cul-de-sac on the north end of the project. <br />As a portion of our original proposal, we made allowances for several modifications to the original report, <br />including: <br />• Extending the roadway to Bunker Lake Boulevard on a curved alignment, <br />• Modifying Ferret Street to a curb and gutter section, <br />• Adding storm sewer piping, along with ponding, and <br />• Removal of the existing cul-de-sac on the north end of the project. <br />We were subsequently requested to perform the following tasks: <br />• Straighten the roadway alignment and modify the Bunker Lake Boulevard median, <br />• Develop two alternative roadway alignments related to implementation of a regional storm water <br />system, and <br />• Add sidewalk along 147th Avenue and along a portion of Ferret Street. <br />At our last meeting, the City also decided to: <br />• Reconstruct the 146th Avenue cul-de-sac, similar to how it is today, <br />• Eliminate the regional pond south of 146' Avenue, <br />• Implement improvements for the Bunker Lake Boulevard median as shown, <br />• Add sidewalk along 147' Avenue, <br />• Add sidewalk along the west side of Ferret Street, south of 147' Avenue, <br />• Coordinate with the ARAA Dome development, and <br />• Update the plans to depict the selected alternative. <br />Bolton & Menk is an equal. opportunity employer. <br />