My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 03/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 3:34:00 PM
Creation date
3/10/2023 3:43:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OBOLTON <br />Real People. Real Solutions. <br />March 8, 2023 <br />Mr. Bruce Westby, P.E. <br />City Engineer / Public Works Director <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: HY-10 Ramsey Improvements— Additional Services <br />City Project 23-12 <br />Dear Mr. Westby: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to assist the City with the West Armstrong Redevelopment Area <br />Improvement project. Our scope and fee letter was originally prepared in the fall of 2021 based on our <br />conversations, along with a review of previously prepared documents associated with the project. <br />Bolton & Menk was originally contracted to update the previously prepared feasibility report (prepared by <br />the City) and complete plans and specifications for Ferret Street from 146' Avenue to Bunker Lake <br />Boulevard. The previous feasibility report considered reclamation of the existing rural section roadway <br />and terminating Ferret Street in a cul-de-sac on the north end of the project. <br />As a portion of our original proposal, we made allowances for several modifications to the original report, <br />including: <br />• Extending the roadway to Bunker Lake Boulevard on a curved alignment, <br />• Modifying Ferret Street to a curb and gutter section, <br />• Adding storm sewer piping, along with ponding, and <br />• Removal of the existing cul-de-sac on the north end of the project. <br />We were subsequently requested to perform the following tasks: <br />• Straighten the roadway alignment and modify the Bunker Lake Boulevard median, <br />• Develop two alternative roadway alignments related to implementation of a regional storm water <br />system, and <br />• Add sidewalk along 147th Avenue and along a portion of Ferret Street. <br />At our last meeting, the City also decided to: <br />• Reconstruct the 146th Avenue cul-de-sac, similar to how it is today, <br />• Eliminate the regional pond south of 146' Avenue, <br />• Implement improvements for the Bunker Lake Boulevard median as shown, <br />• Add sidewalk along 147' Avenue, <br />• Add sidewalk along the west side of Ferret Street, south of 147' Avenue, <br />• Coordinate with the ARAA Dome development, and <br />• Update the plans to depict the selected alternative. <br />Bolton & Menk is an equal. opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.