My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 03/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 3:34:00 PM
Creation date
3/10/2023 3:43:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bruce Westby, P.E. <br />March 8, 2023 <br />Page 2 of 2 <br />At this time, we are requesting additional services for the following items: <br />• Additional survey to allow for the sidewalk design. Winter surveying required. ($4,358.00), <br />• Prepare easement descriptions and exhibits for 2 ROW vacations and 3 new parcels for ROW & <br />D&U easement acquisitions. ($3,384.00), <br />• Additional fees related to developing the regional pond option. For the regional pond option, we <br />included the information in the updated feasibility report. The work associated with preparation <br />and analysis of the second alternative included: preliminary design layout, exhibit preparation, <br />drainage analysis and design, cost estimating. ($11,280.00), <br />• Median design along Bunker Lake Boulevard. Previously, Ferret Street was going to curve to the <br />west and avoid the Bunker Lake Boulevard median. ($5,756.00), and <br />• Sidewalk additions as described above. ($3,220.00). <br />FEES <br />We have listed the fees associated with each of the additional tasks in the above paragraphs. The fees <br />based on staff involved are presented below. <br />Staff Hours Rate Total <br />Survey Manager <br />20 <br />$188.00 <br />$ <br />3,760.00 <br />Survey Field Technician <br />22 <br />$181.00 <br />$ <br />3,982.00 <br />Design Engineer <br />84 <br />$135.00 <br />$11,340.00 <br />Project Engineer <br />40 <br />$161.00 <br />$ <br />6,440.00 <br />Project Manager <br />8 <br />$208.00 <br />$ <br />1,664.00 <br />Traffic Engineer <br />4 <br />$203.00 <br />$ <br />812.00 <br />Totals 189 $277998.00 <br />Based upon the additional work described, we are requesting additional services in the amount of <br />$279998.00. <br />If there are any questions related to this request, please call me at (651) 968-7760. <br />Sincerely, <br />Bolton & Menk, Inc. <br />h { <br />�x <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Bolton & Menk is an equal opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.