My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/14/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 03/14/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 3:34:00 PM
Creation date
3/10/2023 3:43:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/14/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
459
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OBOLTON <br />Real People. Real Solutions. <br />March 9, 2023 <br />Mr. Bruce Westby, P.E. <br />City Engineer/ Director of Public Works <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />RE: Proposal for Construction Related Services — HY-10 Ramsey Improvements <br />City Project No. 23-12 <br />Dear Mr. Westby: <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, M N 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />We appreciate the opportunity to present this scope of services for the HY-10 Ramsey Improvements. <br />Our scope and fees were prepared based on our understanding of the project and our previous <br />experience in assisting the City of Ramsey with similar project types. Our proposed services will be as <br />described below: <br />Contract Preparation — Assist with Notice of Award, Contracts, and Notice to Proceed. Prepare sets of <br />contract documents (plans and specifications) for City and Contractor. <br />Pre -Construction Conference — Facilitate the Pre -Construction Conference and address questions that <br />may arise related to project design or construction staking. Prepare Agenda and Minutes. <br />Shop Drawing / Submittal Review — Review submittals for key project components. <br />Construction Staking — Includes the following: <br />• Staking Calculations and Preparation of Data, <br />• Establishing Survey Control, <br />• Staking of Erosion Control, <br />• Staking of Roadways (Edge of Bituminous and Curblines), <br />• Staking of Sanitary Gravity and Water Services, <br />• Staking of Water Main and Fittings, and <br />• Staking of Storm Sewer. <br />Pay Application Assistance — Work with City and Contractor to complete payment documents. <br />As -Built Survey and Record Drawings — Survey key project components after completion of construction <br />and prepare of Record Drawings. <br />Construction Revisions / Plan Updates — To be performed as needed during construction. We have <br />assumed a total of 44 hours for this task. <br />We have attached a fee spreadsheet depicting hours, rates, and total compensation on a per task basis. <br />Our proposed Not -To -Exceed fees for the work are $34,881.00. <br />Bolton & Menk is an equal. opportunity employer. <br />
The URL can be used to link to this page
Your browser does not support the video tag.