Laserfiche WebLink
The improvements for this concept include: <br />• Slight realignment of CR 63 (Green Valley Road) to be more perpendicular to CSAH 5 <br />• Right turn lane addition to CR 63 <br />• Changed southbound bypass lane configuration to dedicated left turn and through lane <br />The estimated construction cost of the intersection improvement at CSAH 5/CR 63 (Green Valley <br />Road) is $3,100,000. <br />The concept for the improvements at CSAH 5 and CR 63 (175th Avenue NW) is shown in Figure 6. <br />Figure 6: CSAH 5 and CR 63 (175th Avenue NW) Intersection Improvement Concept <br />The improvements for this concept include: <br />• Northbound and Southbound bypass at CR 63 (175th Avenue NW) lanes converted to <br />dedicated left turn lanes. <br />The estimated construction cost of the intersection improvement at CSAH 5/CR 63 (175th Avenue <br />NW) is $1,200,000. <br />18 <br />