My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 03/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 9:19:40 AM
Creation date
3/16/2023 3:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CSAH 5 and 167th Avenue <br />The intersection improvement concept for the CSAH 5/167th Avenue intersection includes <br />converting the intersection into a roundabout. The roundabout option slows traffic to allow for safer <br />turn moves and improved sightlines. The roundabout improvement concept for the CSAH 5/167th <br />Avenue intersection is shown in Figure 7. <br />Figure 7: CSAH 5 and 167th Avenue Intersection Improvement Concept <br />This improvement concept would require new right of way and would likely require a pond. The <br />estimated construction cost of this improvement concept is $3,000,000 - $4,000,000. <br />CSAH 5 and CSAH 56 (Ramsey Boulevard) <br />Two intersection improvement concepts were developed for the CSAH 5/CSAH 56 (Ramsey <br />Boulevard) intersection. The first improvement includes converting the intersection into a <br />roundabout. The roundabout option slows traffic to allow for safer turn moves and improves <br />sightlines. The roundabout improvement concept for the CSAH 5/CSAH 56 (Ramsey Boulevard) <br />Ave intersection is shown in Figure 8. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.