Laserfiche WebLink
Figure 8: CSAH 5 and CSAH 56 (Ramsey Boulevard) Roundabout Improvement Concept <br />The intersection improvement concept shown in Figure 8 will require new right of way and would <br />likely require a pond. The estimated construction cost for the roundabout improvement concept at <br />CSAH 5/CSAH 56 (Ramsey Boulevard) is $3,000,000 - $4,000,000. <br />The second improvement concept for the CSAH 5/CSAH 56 (Ramsey Boulevard) intersection <br />includes a realignment of CSAH 56 (Ramsey Boulevard) and CSAH 5. This concept is shown in Figure 9. <br />20 <br />