My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 03/21/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 03/21/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 9:19:40 AM
Creation date
3/16/2023 3:51:28 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
03/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 9: CSAH 5/CSAH 56 (Ramsey Boulevard) Comparison Table <br />Radius (Feet) <br />870 (existing) <br />960 <br />1,200 <br />1,200 <br />1,432 <br />2,000 <br />Superelevation <br />0.06 <br />0.08 <br />0.08 <br />0.055 <br />0.057 <br />0.054 <br />Design/Advisory Right of Way Impacts Cost <br />Speed <br />50 mph advisory N jA N/A <br />55 mph Minor $2,300,000 <br />60 mph Moderate $2,300,000 <br />55 mph advisory Moderate $2,300,000 <br />55 mph Possible total takes $2,600,000 <br />60 mph Total Takes $3,100,000 <br />The optimal design among these options is understood to be the 1,200 foot radius with a 0.055 <br />superelevation and 55 mph advisory speed. This option balances brining the design of the curve up <br />to the posted speed without incurring extreme right of way cost impacts. <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.