Laserfiche WebLink
Case #4: Consider Storm Sewer Improvements at 168th and TH 47 <br /> <br />Assistant Public Works Director Olson stated staff received a call from a resident after the recent <br />heavy rains regarding the level of water in the adjacent pond. Staff visited the site and found that <br />the water level in the pond was elevated. The site is north of 168th Avenue and west of TH 47. <br />There is a drainage route out of the pond that includes the ditches along 168th Avenue, a culvert <br />under TH 47 and ponds, swales and a pipe across the Rum River Hills Golf Course. The pipe <br />under 168th Avenue was not draining so the water was pumped over 168th Avenue. The system <br />downstream across the golf course was flowing; however, it drained slowly. The water flows <br />into the Rum River on the east side of the golf course. The size of the pipe was checked after the <br />water level was lowered. The pipe may be too small for the ama draining to it. He advised a <br />drainage study should be performed to verify the size of pipe required for this area. The analysis <br />can be performed by staff. The pipe is on the golf course; however, ~vater from the City storm <br />sewer system passes through it so participation by the City is warranted. If replacement of the <br />pipe is justified it must be coordinated with the off-season of the golf course. The optimal time <br />for replacement of the pipe may be after the ground freezes to prevent damage to the turf surface. <br /> <br />Assistant Public Works Director Olson advised staff recommends performing the drainage study <br />to analyze this area and provide a recommendation for improving the performance of the <br />drainage system. An agreement would be drafted with the golf course to divide the costs of the <br />improvements and provide access to the site to perform the work. The project would be brought <br />back to the City Council for authorization of the solicitation of bids and construction of the <br />improvements. <br /> <br />Motion by Mayor Gamec, seconded by Councilmember Olson, to recommend that the City <br />Council authorize the drainage study for the area around 168th Avenue and TH 47. <br /> <br />Motion can/ed. Voting Yes: Acting Chairperson Cook, Mayor Gamec and Councilmember <br />Olson. Voting No: None. Absent: Chairperson Elvig. <br /> <br />Case #5: Project Closeout of TH 47 Improvement Project <br /> <br />City Engineer Jankowski explained in May of 2000 construction was initiated on TH 47 between <br />14 nd . . <br /> 2 Avenue and Alpine Drive, which created a divided median with tum lanes and <br />substantially widened the driving lanes. The City undertook the role of lead agency for this <br />project as it was a high priority for the City. MnDOT assisted with this project by providing <br />construction inspection and preparation of pay estimates for work performed by the contractor. <br />He explained the project was opened to traffic in the fall of 2000, however, approximately <br />$500,000 of the total $4.9 million project was incurred for work, which was performed over the <br />succeeding construction year of 2001. The work done in 2001 included the installation of <br />landscaping which the specifications stated must survive for two years before final payment can <br />be processed. The last payment the City processed on this project was made in August of 2002. <br />The prime contractor on this project, Richard Knutson Inc., has never requested any additional <br />payment, however, a landscaping subcontractor that provided trees for the project has requested <br /> <br />Public Works Committee / October 18, 2005 <br /> Page 5 of 7 <br /> <br /> <br />