My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/28/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 03/28/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:10:29 AM
Creation date
3/29/2023 11:06:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/28/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember introduced the following resolution and moved for its adoption: <br />RESOLUTION #23-070 <br />RESOLUTION ACCEPTING STABILIZED FULL -DEPTH RECLAMATION DESIGN <br />PROPOSALS FOR IMPROVEMENT PROJECT #23-04, 167TH AVENUE <br />RECONSTRUCTION <br />WHEREAS, the City of Ramsey Proposes to reconstruct 167th Avenue between Nowthen <br />Boulevard and Trunk Highway 47 in 2023 as identified within the 2022-2031 10-Year Capital <br />Improvement Program: and <br />WHEREAS, pursuant to Ramsey City Council resolution #22-130, adopted June 14th, <br />2022, the City Council accepted and awarded the proposal to Bolten & Menk, Inc., for <br />Topographic Survey of the project area; and <br />WHEREAS, pursuant to Ramsey City Council resolution #22-201, adopted August 23rd, <br />2022, the City Council ordered the City Engineer to prepare plans and specifications for <br />Improvement Project #23 -04; and <br />WHEREAS, pursuant to Ramsey City Council resolution #22-204, adopted August 23rd, <br />2022, the City Council accepted the proposal of Haugo Geotechnical Services to complete <br />geotechnical evaluations for Improvement Project #23-04; and <br />WHEREAS, pursuant to Ramsey City Council resolution #22-270, adopted November <br />22nd, 2022, the City Council accepted the proposal of Bolton & Menk, Inc. to prepare final plans <br />and specifications for Improvement Project #23 -04; and <br />WHEREAS, the project is determined to require a stabilized full -depth reclamation mix <br />design, which is beyond the ability of Bolton & Menk to perform; and <br />WHEREAS, request for proposals were submitted to two firms for the purpose of <br />obtaining quotes for completing the proposed stabilized full -depth reclamation mix design <br />services; and <br />WHEREAS, the two (2) stabilized full -depth reclamation mix design quotes received are <br />tabulated below; and <br />STABILIZED FULL -DEPTH RECLAMATION MIX DESIGN PROPOSAL <br />Project <br />Braun Intertec <br />American Engineering <br />Testing <br />167th Avenue Reconstruction <br />$181065.00 <br />$20,630.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.