Laserfiche WebLink
% of Cost <br />Land Use Tyne <br />Assessed <br />Commercial <br />90% <br />Non-Profit/Tax Exempt Property/Institutional <br />75% <br />Medium and High Density Residential <br />33%' <br />Low Density <br />33% ' <br />Based on standard 32' residential street, see Section IIA. <br />2. Unplatted or vacant commercial, retail, non-profit, tax exempt, and institutional, properties <br />will be assessed as described above based upon the land use allowed by the ordinance. <br />3. Rural Minor Arterial/Major Collector outside the MUSA <br />Streets, Curb and Gutter <br />a. Commercial, agricultural, retail, non-profit, tax-exempt, institutional, low, medium <br />and high density residential frontages will be assessed based on the following table <br />of estimated benefit received as a result of a roadway major maintenance project. <br />PARCEL SIZE (acres) <br />BENEFIT <br />0.0 - 4.9 <br />$2,000 <br />5.0 - 9.9 <br />$3,000 <br />10.0 - 14.9 <br />$3,000 <br />15.0 - 19.9 <br />$3,750 <br />20.0 - 29.9 <br />$5,000 <br />30.0 - 39.9 <br />$6,750 <br />40.0 - 59.9 <br />$9,000 <br />60.0 - 79.9 <br />$12,000 <br />80.0 - 99.9 <br />$16,000 <br />100.0 - 119.9 <br />$18,750 <br />120.0 - 139.9 <br />$21,000 <br />140.0 - 159.9 <br />$24,500 <br />160.0+ <br />$28,000 <br />b. Unplatted or vacant commercial, agricultural, retail, tax exempt, institutional, <br />single, and medium and high density residential properties will be assessed as <br />described above based upon the land use allowed by the ordinance. <br />C. Unplatted or vacant properties zoned residential that have frontage on two or more <br />City owned roadways will be assessed for major roadway maintenance performed <br />only on the roadway on which the property has the greatest frontage. For said <br />properties that have frontage on both a City owned and non -City owned roadway, <br />the property will be assessed for major maintenance performed on the Cityowned <br />roadway. <br />ASSOCIATED INFRASTRUCTURE REPAIRS <br />A. Storm Sewer, Sanitary Sewer and Water: <br />1. The cost of lateral storm sewer improvements maintenance, new and reconstruction within <br />the area where streets are receiving major maintenance will be included in the project cost to <br />