Laserfiche WebLink
CAPITOL IMPROVEMENT BUDGET <br /> <br />Sanitary Sewer <br /> <br />Facility Plan - Check with Jim Bartin <br /> <br />Sewer Trunks <br /> <br />City Share (all phases) - this will be available at the <br />meeting <br /> <br />Water <br /> <br />Pros' <br /> <br />-- Fire Protection - Sprinkler Systems <br />-- Disturb street only once <br />-- Promote commercial and industrial development <br />-- Minimized contaminated water sources ten years away <br />-- Lower construction cost <br /> <br />Cons <br /> <br />-- Existing homes have own wells <br />-- Assessment burden <br />-- People aren't ready for utilities <br />-- City doesn't have operating budget, staff and equipment <br /> <br />Summary <br /> <br />E~n though it would be more economical for sewer and water to <br />be installed at the same time, the City does appear to be ready <br />for sanitary sewer much less the combination of the two. <br /> <br />Sealcoating <br /> <br />Pros <br /> <br />-- You have to maintain streets <br />-- More economical to sealcoat thmn to replace streets <br /> <br />Cons <br /> <br />Streets may have deteriorated to such a bad condition that <br />sealcoatlng may not be adequate to prolong the llfe of the <br />streets. <br /> <br /> <br />