My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/18/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 04/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:59 AM
Creation date
4/14/2023 3:42:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL SPECIFICATIONS <br />Provide and plant trees, and provide and install irrigation system as follows: <br />I/ We agree to furnish all trees, materials, labor and incidentals to perform the work below. <br />• Mobilization, deliver and plant, B & B trees approximately 60" back of curb in the <br />locations shown in the attached plan view document (Appendix). <br />• A mandatory pre -construction meeting shall occur at the job with the City and the <br />Contractor's on -site supervisor. <br />• Each tree shall have no less than 1/2 cubic yard 'Plaisted's Growers Mix' <br />incorporated into the parent soil immediately surrounding each tree, at a rate of <br />25% Plaisted's soil to 75% native or parent soil. <br />• All trees shall be staked or paint -located in the ROW, approximately 40' O.C. by <br />the contractor, and then verified/approved by a City representative. <br />• Trees shall be thoroughly watered -in upon planting, and kept sufficiently moist <br />by the Contractor until acceptance of the irrigation system by the City. <br />• Trees shall be individually approved for planting on site by the City upon visual <br />inspection —no park grade trees permitted, nor any defects in the trunk will be <br />approved. <br />• The root flare shall be properly located level with the top of the B-style curb, even <br />if the ground level slopes down and away from back of curb. It is not anticipated <br />that any soil generated from the tree planting excavations will be hauled away — <br />rather, this sand may be evenly spread parallel to the curb line to level the ROW <br />where the tree planting is to take place. <br />• After the correct placement and planting depth is approved by the city <br />representative, a 4' diameter circle of 'mink mulch' wood chips shall be placed <br />around each tree, 3" to 4" in depth. <br />• All trees shall be warranted for a period of 18 months following installation and <br />acceptance by the City. <br />2 I Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.