My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/18/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 04/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:59 AM
Creation date
4/14/2023 3:42:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Base Bid tree planting shall include the following trees at a minimum 2.5 diameter, <br />with Elms (only) a minimum of 3" dbh: <br />6, Swamp White Oak <br />6, Red Oak <br />6, Heritage River Birch (single stem) <br />6, Accolade Elm <br />And 6 trees each (18 trees), of three of the following species; <br />Bur Oak <br />Sentry Linden <br />Expresso Kentucky Coffee Tree <br />Street Keeper Locust <br />Sienna Glenn Maple <br />• Add Alternate tree planting shall include the following trees at a minimum 2.5 <br />diameter, with Elms (only) a minimum of 3" dbh: <br />6, Swamp White Oak <br />6, Heritage River Birch (single stem) <br />6, Expresso Kentucky Coffee Tree <br />6, Accolade Elm <br />And 6 trees each (12 trees), of two of the following species; <br />Bur Oak <br />Sentry Linden <br />Street Keeper Locust <br />Sienna Glenn Maple <br />• This Request for Proposal shall be a not -to -exceed amount, for the irrigation <br />component, and numbers of trees to be planted. If upon field staking, it is <br />determined that the tree count (of 42 or 36) can not 'fit' in the corresponding street <br />blocks, the tree(s) shall be planted by the Contractor elsewhere in the downtown <br />area, without the corresponding irrigation component. The Contractor must <br />include within his/her quote any time or materials necessary and incidental to <br />complete the work in a professional and quality manner. There will be no Change <br />Orders. <br />3 I Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.