Laserfiche WebLink
• Key points of the design -build irrigation are noted on the 7 page appendix and <br />may not be to scale — The relevant notes germane to this RFP are in color (many <br />notes in black and white are carried forward in the plan view drawing from a <br />previous project) . All irrigation components shall be staked or located for field <br />verification and approval by the city. <br />• The Base Bid irrigation main line is in place and consists of a 2" PVC pressurized <br />pipe 32" to 48" below grade approximately 8' to 10' north of the curb line. <br />• The Add Alternate CL200 2" PVC main line shall be provided by the Contractor <br />and installed 1.5' to 2' feet deep, approximately 1' foot back of curb. <br />• There shall be one Acclima decoder and one Hunter PROS valve per block A, B, <br />and C for three total decoders and valves for the Base Bid. There shall be one <br />Acclima decoder and one Hunter PROS valve per block D and E for two total <br />decoders and valves for the Add Alternate blocks. <br />• Each block shall be served by 40 psi MP pop-up pressure regulating heads. The <br />spray pattern shall be 5' x 30' with an approximate 20 % overlap between heads <br />(maximum spacing of 21' to 24' feet) . Each zone line shall be connected to the main <br />line with a 1" poly pipe. Each pop-up shall be connected to the zone line with <br />'funny pipe'. <br />• There shall be one surge protector in the Base Bid block and another in the Add <br />Alternate block, or more frequency if the Acclima manufacturing specifications <br />call for it. There shall be one 8' foot ground rod 5/8" diameter every 500' feet or <br />less, and located within 24" of each decoder. The ground rod shall be connected <br />by a #6 or # 10 copper wire. <br />• Each decoder and valve shall be in a green, 21" by 15" NDS 'jumbo' irrigation box <br />blocked and secured to industry standards. <br />• The Acclima 2-wire system shall include a 14 gauge (blue or orange) jacketed wire. <br />• The contractor shall work with the City to program decoders, valves, with the Base <br />Bid, and Add Alternate blocks on -site, following irrigation component installation. <br />The Acclima CS3500 Installation Checklist (included in the Appendix) shall be <br />consulted as part of part of project acceptance (where applicable), including also <br />that spray patterns do not overlap curbing or street pavement. <br />Work and Staging Areas: <br />Confine work activities to the immediate project area, and approved traffic control and <br />signage shall be employed for all vehicles, equipment and persons within Sunwood <br />4IPage <br />