My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/18/2023
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2023
>
Agenda - Public Works Committee - 04/18/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:42:59 AM
Creation date
4/14/2023 3:42:21 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/18/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drive. Contactor is responsible for protecting pavement edge at the street from breaking <br />and damage. No construction activity shall be performed before 7 AM nor after 7 PM <br />Monday through Saturday. The contractor shall provide 72 hour advance notice before <br />working on Saturday. City Council approval is required for Sunday work. <br />A dumpster is not anticipated to be needed on site, and no construction related disposal <br />is to be placed in the trash receptacles along Sunwood Drive. <br />Warranty/Guarantee: <br />The Contractor warrants and guarantees to the Owner that all Work will be of good <br />quality and free from faults or defects for 18 months and in accordance with this RFP. <br />All defective Work may be rejected. <br />If required by the Owner, prior to payment, the Contractor will promptly without cost to <br />the Owner, correct defective Work, or replace it with non -defective Work. If the <br />Contractor does not correct such defective Work or remove and replace within a <br />reasonable time, the Owner may have the deficiency corrected or the rejected Work <br />removed and replaced. All direct or indirect costs of such correction or removal and <br />replacement, including compensation for additional professional services shall be paid <br />by the Contractor, or deducted by the Owner, all such costs from the quoted contract <br />price. <br />If, instead of requiring correction or removal and replacement of defective Work, the <br />Owner (prior to approval of final payment) prefers to accept it, they may do so. In such <br />case, if the acceptance occurs prior to payment, a Statement shall be issued incorporating <br />the necessary revisions, including appropriate reductions in Contract Price. <br />Specification References: <br />• Plaisted's Grower's Mix <br />https://plaistedcompanies.com/horticultural-mixes/ <br />Plaisted <br />Companies <br />N C 0 Fl POR ATED <br />PO. Box 332 + 11555 205th Avenue NW * E I k River, MN 55 330 U.S.A. <br />r _plaistedcDmpanies.corn <br />Te 1753.441,1 100 • Fax 763.441.7782 <br />53 QlAge <br />
The URL can be used to link to this page
Your browser does not support the video tag.