dry during seasonally high-water. In the areas not requiring corrections, Staff is proposing to use a pavement <br />section made up of 6-inches in -place reclamation material below 3.5-inches of new bituminous pavement. <br />This project proposes to remove the stub street at the comer of Dysprosium Street and 161st Lane, and create a <br />true comer, since the development of the adjacent Scout Camp property is not currently proposed to occur. <br />In general, the current swales along the streets are not proposed to be re -graded as part of this project. Due to the <br />nature of subsoil corrections, and raising the profile of the pavement, some areas of the project will have impacts <br />to the in -slopes between the pavement and bottom of the swales. No changes to the current drainage pattern are <br />proposed. The existing culverts crossing the streets are proposed to be removed and replaced, this is to ensure the <br />culverts will last at least through the proposed 60-year design life of the street. Due to the subsoil corrections, <br />drain tile will be added in the low areas to properly drain the pavement subbase. The drain tile is proposed to drain <br />into the existing swales. <br />Preliminary Schedule Remaining <br />• Council Approves Plans and Specifications / Authorizes Ad for Bids <br />o April 25, 2023 <br />• Staff Receives Bids <br />o May 19, 2023 <br />• Council Awards Contract to the lowest responsible bidder <br />o May 23, 2023 <br />• Contractor begins construction <br />o June 2023 <br />• Contractor Substantially Completes construction <br />o September 1, 2023 <br />• Contractor Final Completion (verify final restoration, punch list created) <br />o September 29, 2023 <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical sections, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Timeframe: <br />Staff estimates up to 10 minutes will be needed to present this case and respond to questions. <br />Observations/Alternatives: <br />Observations: <br />During project design and review of the initial geotechnical report, Staff noted a change in the subsoil conditions <br />between gaps of several hundred feet in the soil borings. Additional soil borings within an addendum to the <br />geotechnical report were acquired, which allowed Staff to more accurately place the limits to the subsoil <br />correction areas, and expand the areas as necessary. Performing additional soil borings was discussed as a hopeful <br />solution to change orders due to unforeseen subsoil conditions as part of the 2021 Tiger Street Reconstruction, <br />Improvement Project #21-02. <br />Alternatives: <br />Alternative #1 — Motion recommending City Council approving plans and specifications and authorizing <br />advertisement for bids for Barthel's Rum River Acres 2nd Street Reconstructions, Improvement Project #23-05. <br />Alternative #2 — Motion of other. <br />