My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 04/25/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:02:01 PM
Creation date
4/24/2023 3:40:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Ramsey — Ramsey Water Treatment Plant <br />AET Proposal No. P-0021454 <br />April 10, 2023 <br />Page 3 of 8 <br />ENGINEERING rEsTiNG <br />Reinforcing Steel Observations <br />Prior to placement of concrete AET will observe the mild reinforcing steel placed in the <br />formwork for cast -in -place concrete elements for the building. These observations will be <br />performed on an on -call basis by an experienced Engineering Technician II working under <br />the guidance of ICC certified personnel. While at the site, the AET personnel will perform <br />the following services: <br />• Review the most recent plans and specifications available at the jobsite. <br />• Observe that the correct number, size, alignment, and spacing of the bars are <br />provided for the structural elements observed. <br />• Observe that the reinforcing steel bars are provided with the specified cover from <br />formwork, the ground surface, and any future concrete elements. <br />• Observe that the bars are free of dirt, rust, scale, ice, or other deleterious materials <br />that will reduce adhesion to the concrete. <br />• Observe that anchor bolts are installed in the concrete at the spacing indicated on the <br />project plans. <br />Any discrepancies or deficiencies that are observed will be brought to the attention of the <br />contractor and/or their subcontractor. Daily reports of our observations will be available <br />to the contractor and/or authorized personnel at the site. <br />AET does not provide surveying services, therefore, our observations of the reinforcing <br />steel will be based on the positioning of the formwork by the contractor and/or their <br />subcontractors. We are not responsible for the exact locations of the formwork, structural <br />bolts, or embedded items. <br />Concrete Testing <br />Personnel from AET will perform testing of concrete on an on -call basis when requested <br />by the contractor. These services will be performed by experienced, ACI certified <br />Engineering Technician II at the frequencies required by the project specifications. On <br />site visits when we are observing reinforcing steel, we will have the same Engineering <br />Technician II remain at the site to perform testing of the concrete, thus reducing <br />mobilization charges. Our services will include the following: <br />• Document that the correct mix is delivered to the site by checking the delivery slips. <br />• Test the slump of the plastic concrete delivered to the site. <br />• Test the air content of the plastic concrete delivered to the site. <br />• Measure the temperature of the plastic concrete delivered to the site. <br />• Compare the test results to the requirements of the project specifications. <br />Any discrepancies from the project specifications will be brought to the attention of the <br />contractor and/or their subcontractor. Daily field reports of our observations and testing <br />will be available to the contractor and other authorized personnel at the site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.