City of Ramsey — Ramsey Water Treatment Plant <br />AET Proposal No. P-0021454 <br />April 10, 2023 <br />Page 4 of 8 <br />ENGINEERING rEstiNG <br />During placement of the concrete, our Engineering Technician II will also cast test <br />cylinders for compressive strength testing. Project specifications require that one set of <br />cylinders be cast for every 50 cubic yards (or fraction thereof) of each type of concrete <br />placed each day. Each set will consist of four cylinders; one which will be tested after 7 <br />days and three which will be tested after 28 days. Extra cylinders can be cast at your <br />request. AET will also pick up the cylinders from the site and return them to our laboratory <br />for moist curing and testing. The results of our compressive strength tests will be <br />presented periodically, as they become available. <br />We estimate 42 trips will be required by the Engineering Technician II to complete the <br />reinforcing steel observation and concrete testing services for reinforced concrete <br />portions of the new construction. <br />Masonry Observations and Testing <br />During construction, AET personnel will perform observations during masonry wall <br />construction, as well as testing of mortar and grout (if required). Our observations and <br />testing will be performed by an experienced Engineering Technician II on an on -call basis, <br />and will include the following services: <br />• Observe that the proper size units are used. <br />• Observe that the units are clean, sound and dry when placed. <br />• Observe that the masonry bearing surfaces are clean. <br />• Observe the placement and alignment of vertical reinforcing bars and dowels, and <br />document that the correct sizes of bars are used. <br />• Observe the placement and alignment of horizontal reinforcing bars, and document <br />that the correct sizes of bars are used. <br />• Observe that the correct lengths of bar lap splices are provided. <br />• Observe that the proper clearance is provided between the bars and the masonry <br />units. <br />• Observe the general construction practices, including compliance with proper cold or <br />hot weather protection as required by the project specifications. <br />We estimate that our Engineering Technician II will make 6 trips to conduct these <br />observation and testing services. <br />Any discrepancies from the project specifications will be brought to the attention of the <br />contractor and/or their subcontractor. Daily field reports of our observations and testing <br />will be available to the contractor and other authorized site personnel. <br />While at the site the Engineering Technician II will also sample the grout. The grout <br />"prism" specimens will be cast for compressive strength testing according to IBC <br />guidelines. One set of four grout "prisms" will be cast according to the testing frequency <br />required by the project specifications. One of the "prisms" will be tested for compressive <br />