My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 04/25/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:02:01 PM
Creation date
4/24/2023 3:40:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 10. <br />Meeting Date: 04/25/2023 <br />Submitted For: Joe Feriancek, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title <br />Adopt Resolution #23-082 Approving Plans and Specifications and Authorizing Advertisement for Bid for <br />Improvement Project #23-05, Barthel's Rum River Acres 2nd Street Reconstructions <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-082 approving plans and specifications and authorizing <br />advertisement for bids for Improvement Project #23-05, Barthel's Rum River Acres 2nd Street Reconstructions. <br />Background: <br />City Improvement Project #23-05 proposes to reconstruct the streets within the Barthel's Rum River Acres 2nd <br />subdivision, generally located between 161st Avenue and 164th Avenue, adjacent to the Rum River. The streets <br />are 24 feet wide rural section with drainage swales along both sides of the streets, totaling 1.64 miles in length. A <br />street segment summary is attached to this case for reference. <br />Project History <br />• 2023 — 2032 Capital Improvement Program — listed as street reconstruction for 2023 <br />• Resolution #22-204 & Resolution #22-202 adopted August 23, 2022, City Council accepted proposals for <br />geotechnical report and topographic survey <br />• November 15, 2022 Public Works Committee recommended City Council order plans and specifications <br />• Resolution #22-286 adopted December 13, 2022, City Council ordered plans and specifications <br />• Resolution #23-047 adopted February 28, 2023, City Council accepted a proposal for an addendum to the <br />geotechnical report <br />• April 18, 2023 Public Works Committee recommended City Council approve plans and specifications and <br />authorize advertisement for bids <br />Pavement History <br />The streets within the subdivision were built in 1988. Pavement maintenance has included an initial round of <br />crack seal / seal coat improvements in 1994. In 1997 161 st Lane and Dysprosium Street received overlay <br />improvements. All street segments received 2 more rounds of crack seal / seal coat improvements in 2001 and <br />2009. Maintenance crews have performed patching over the last several years, including patching some areas of <br />the road with clay subgrade coming to the surface. 2021 PASER values we 2 for all street segments. PASER <br />values of 2 are as low as any street segments within the City. <br />Ground Penetrating Radar (GPR) was performed on the street segments. Bituminous pavement thickness averages <br />were between 3.0 and 3.7 inches thick on the various street segment. Aggregate base thickness was found to vary <br />between 4.0 and 4.6 inches thick. GPR data was not available for some street segments. The GPR summary is <br />included in the attached street segment summary. <br />Proposed Improvements <br />Staff review of the geotechnical report found a mix of native sandy and clayey alluvial soils made up the sub -base <br />material. The sandy materials are well suited for pavement support and are considered non -frost susceptible and <br />are also free draining materials. The clayey soils are considered undesirable materials, and are proposed to be <br />replaced with 2 feet of select granular material on top of geotechnical fabric. Generally, these subsoil corrections <br />
The URL can be used to link to this page
Your browser does not support the video tag.