Laserfiche WebLink
are proposed along 164th Avenue, the northern portion of Germanium Street, and 161 st Avenue connecting into <br />the Estates of Silver Oaks subdivision. Additionally, the southern portion of Germanium Street and adjacent 161st <br />Lane was found to have a high-water table, which seasonally impacts the strength of the pavement section. The <br />project proposes to raise the elevation of the pavement approximately 1-foot to allow the pavement section to be <br />dry during seasonally high-water. In the areas not requiring corrections, Staff is proposing to use a pavement <br />section made up of 6-inches in -place reclamation material below 3.5-inches of new bituminous pavement. <br />This project proposes to remove the stub street at the corner of Dysprosium Street and 161 st Lane, and create a <br />true comer, since the development of the adjacent Scout Camp property is not currently proposed to occur. <br />In general, the current swales along the streets are not proposed to be re -graded as part of this project. Due to the <br />nature of subsoil corrections, and raising the profile of the pavement, some areas of the project will have impacts <br />to the in -slopes between the pavement and bottom of the swales. No changes to the current drainage patterns are <br />proposed. The existing culverts crossing the streets are proposed to be removed and replaced, this is to ensure the <br />culverts will last at least through the proposed 60-year design life of the street. Due to the subsoil corrections, <br />drain tile will be added in the low areas to properly drain the pavement subbase. The drain tile is proposed to drain <br />into the existing swales. <br />Preliminary Schedule Remaining <br />• Staff Receives Bids <br />o May 19, 2023 <br />• Council Awards Contract to the lowest responsible bidder <br />o May 23, 2023 <br />• Contractor begins construction <br />o June 2023 <br />• Contractor Substantially Completes construction <br />o September 1, 2023 <br />• Contractor Final Completion (verify final restoration, punch list created) <br />o September 29, 2023 <br />Bid Opening <br />Staff proposes to open bids on May 19, 2023, and to present the bid results to City Council on May 23, 2023 for <br />award of a construction contract to the lowest responsible bidder. <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical sections, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />The proposed improvements are designated as City Improvement Project #23-05, Barthel's Rum River Acres 2nd <br />Street Reconstructions. <br />Notification: <br />If Council approves plans and specifications and authorizes advertising for bids, bids will be advertised on <br />Friday, April 28, and again on Friday May 5, 2023, in the City's official newspaper, the Anoka Union Herald. <br />Additionally, letters will be mailed to property owners with updates on the project status. Engineering Staff <br />maintains City Improvement webpages with the most current project information, this can be found on the City <br />website, Engineering department page. <br />Observations/Alternatives: <br />