My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/25/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 04/25/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 5:02:01 PM
Creation date
4/24/2023 3:40:29 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/25/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
603
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations: <br />During project design and review of the initial geotechnical report, Staff noted a change in the subsoil conditions <br />between gaps of several hundred feet in the soil borings. Additional soil borings within an addendum to the <br />geotechnical report were acquired, which allowed Staff to more accurately place the limits to the subsoil <br />correction areas, and expand the areas as necessary. Performing additional soil borings was discussed as a hopeful <br />solution to change orders due to unforeseen subsoil conditions as part of the 2021 Tiger Street Reconstruction, <br />Improvement Project #21-02. <br />Alternatives: <br />Motion to adopt Resolution #23-082 approving plans and specifications and authorizing advertisement for bids for <br />Improvement Project #23-05, Barthel's Rum River Acres 2nd Street Reconstructions. <br />Funding Source: <br />Funding for this improvement is proposed to come from Pavement Management Funds and Stormwater Utility <br />Funds. <br />Staff has completed an estimate based on the final plans and anticipated 2023 construction costs, with a total <br />estimated project cost of $2,128,746.75, which includes 23-percent indirect costs for administrative, engineering, <br />finance, and legal costs. <br />• Street Project Costs $1,965,662.89 <br />• Storm Sewer Project Costs $163,083.86 <br />• Total Estimated Costs $2,128,746.75 <br />Recommendation: <br />Staff recommends adopting Resolution #23-082 approving plans and specifications and authorizing advertisement <br />for bids for Improvement Project #23-05, Barthel's Rum River Acres 2nd Street Reconstructions. <br />On April 18, 2023 the Ramsey Public Works Committee reviewed the improvement project and recommended <br />City Council approve the plans and specifications and authorize advertisement for bids. <br />Action: <br />Adopt Resolution #23-082 approving plans and specifications and authorizing advertisement for bids for <br />Improvement Project #23-05, Barthel's Rum River Acres 2nd Street Reconstructions. <br />Res 23-082 <br />23-05 Project Scope <br />23-05 Street Summary <br />23-05 Title Sheet <br />23-05 Typical Sections <br />Inbox <br />Bruce Westby <br />Brian Hagen <br />Form Started By: Joe Feriancek <br />Final Approval Date: 04/20/2023 <br />Reviewed By <br />Bruce Westby <br />Brian Hagen <br />Attachments <br />Form Review <br />Date <br />04/20/2023 11:17 AM <br />04/20/2023 12:49 PM <br />Started On: 04/17/2023 02:00 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.