Comprehensive Plan amendment is required. The residential properties south of 161st Avenue are not within the <br />MUSA, and Staff is not proposing to extend water and sewer services to these properties with this project. <br />Anticipated Build Process <br />• Install traffic control measures <br />o These are maintained throughout the project <br />o Layout of traffic control may be adjusted to accommodate construction periodically <br />• Install erosion control measures <br />• Mass grading of storm sewer ponds <br />• Full -depth reclamation of existing bituminous pavement and aggregate base <br />o Haul off -site to stockpile location (to be recycled as new aggregate base) <br />• Project removals (parking lot pavement, remaining trees, salvage mail box posts, etc.) <br />• Utility installation <br />o Sanitary sewer; watermain, storm sewer <br />• Haul in aggregate base <br />• Place new concrete curb and gutter, concrete valley gutters, and pedestrian ramps <br />• Tolerance aggregate base, place first lift of new bituminous pavement, including trail and parking lot <br />• Final any trail and driveway repairs <br />• Restore the boulevard in any impacted areas <br />o 4 inches topsoil; seed and hydro -mulch in boulevards, erosion control blanket in ponds <br />• Place the final lift of new bituminous pavement <br />o place all pavement markings, must wait 72 hours after paving <br />• Erosion control measures are removed after restoration has been completed. <br />Preliminary Schedule Remaining <br />• Council approves plans and specifications / authorizes advertisement for bids <br />o March 14, 2023 <br />• Staff receives bids <br />o April 19, 2023 <br />• Council awards contract to the lowest responsible bidder <br />o April 25, 2023 <br />• Contractor begins construction <br />o Late May / Early June 2023 <br />• Contractor substantially completes construction <br />o September 1, 2023 <br />• Contractor final completion (project clean up, punch list created) <br />o September 29, 2023 <br />State Aid Approval <br />Plans were reviewed and approved by the MnDOT State Aid office, which was required before the project could <br />be bid. No major changes to the project were required based off the State Aid review. <br />Permit Approvals <br />Before construction can begin, Staff must obtain permits from the Minnesota Pollution Control Agency for a <br />sanitary sewer extension permit, Minnesota Department of Health for a watermain extension permit, Lower Rum <br />River Watershed Management Organization for a grading, stormwater management and erosion / sediment <br />control permit, and Anoka County for a highway right of way permit. These permit approvals are not anticipated <br />to impact the proposed project start date. <br />The proposed improvements are designated as City Improvement Project #23-01, 161 st Avenue Reconstruction. <br />Notification: <br />