Laserfiche WebLink
I <br />I <br />I <br />I <br />I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br />Page <br />July <br /> <br />5 <br /> <br />Se <br /> <br />2 <br />18, 1984 <br /> <br />Central Park Construction: The well at Central Park was tested <br />on July 16 and 17, 1984. Test results show that the well can <br />produce up to 500 gallons per minute sand-free. The proposed <br />pumping rate is 280 gallons per minute. The mechanical and <br />electrical hookup are scheduled to be completed next week. Also, <br />the additional irrigation heads are scheduled to be installed <br />next week. <br /> <br /> Rollin9 Green and Magnesium Street: These projects were awarded <br /> at the June 12, 1984 council meeting to Hardrives, Inc. <br /> Rolling Green was paved last week and Magnesium Street is <br /> scheduled for paving in the near future. <br /> <br /> Street Seal Coating: The seal coating projects were awarded to <br /> Allied Blacktop Company at the June 12, 1984 council meeting. <br /> Construction is scheduled to begin on July 24, 1984. <br /> <br /> <br />