My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/28/1981
Ramsey
>
Public
>
Agendas
>
Council
>
1981
>
Agenda - Council - 04/28/1981
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:38:14 PM
Creation date
3/27/2006 11:29:16 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/28/1981
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />I% <br />for pushing and pulling. Cable connection to valve <br />spool must be enclosed and sealed with protective <br />bonnet. Valve control lever to be capable of being <br />stacked and tied together with studs. Valve control <br />to be a Morse E206301/D302079 -120 or approved equal. <br />Line Check: Line check to be installed on the inlet of the combined <br />flow section. Line check shall be a LT -75 Gresen or <br />approved equal. <br />5) Trailer Hitch: Shall be fitted with a Holland T -100 pintle hook with <br />reinforcing " A " frame. <br />6) Auxiliary lights: Provide high mounted seal beam headlights, (mounted <br />on plow frame bracket), wing light and sander light. <br />Mount rear turn signals and tail lights on rear of <br />dump box in protected location. Install revolving <br />light with leveling bracket with counter balance, <br />mounted on the cab shield with dash mounted switch. <br />7) Paint: All equipment and connections or brackets shall be given one <br />coat of primer and one coat of Highway Orange (93- 55546H) to <br />match the cab. <br />8) Warantee: Each bidder shall furnish a signed warantee of the equipment <br />included in this package. The warantee period shall be for <br />a period of at least one year, and cover all parts and labor <br />from defects in material and workmanship. <br />9) Manuals: The successful bidder shall furnish operator's manuals, shop <br />manuals, lubrication charts and parts books for the various <br />items of equipment being furnished. <br />10) All noted equipment shall be installed. <br />111 The bidder shall state in his proposal a complete description of each <br />item of equipment being furnished. <br />
The URL can be used to link to this page
Your browser does not support the video tag.