My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/26/1988
Ramsey
>
Public
>
Agendas
>
Council
>
1988
>
Agenda - Council - 04/26/1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 12:22:13 PM
Creation date
3/30/2006 2:13:53 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/26/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 11, 1988 <br /> <br />Hakinson Anderson <br />222 1.1onroe Street <br />Anoka, Minnesota <br /> <br />Associates, <br />55303 <br /> <br />Attention: Peter R. Raatikka <br /> <br />Re: <br /> <br />500MG Elevated Water Tank <br />city of Ramsey <br />Ramsey, MN <br /> <br />Subj eot: <br /> <br />CBI Na-Con, Inc. <br /> <br /> ~24137 111trt Street <br /> Plainflel(:l. Illinois 60544 <br /> <br /> 815 43G 9800 <br /> Telex 50977,~ <br /> <br />Suggested Deletions from <br />the Project. <br /> <br />Dear Mr. Raatikka: <br />As we had discussed, CBI Na-Con is pleased to offer the following <br />modifications to the elevated water tower project as bid and <br />awarded on April 5, 1988. <br /> <br /> 1.) Deleted the 10' x 10' Garage door and eliminate the <br /> minimum 30' DIA requirment for the tank foundation. The <br /> riser pipe will come straight out of the valve vault. <br /> The bituminous drive will stop 10' from the tank and be <br /> replaced with a 5' wide concrete walk which will go to <br /> the personal door located where the 10' x 10' door was <br /> originally shown. <br /> <br /> Total Deduct $20,150. <br /> <br /> 2.) Change the 16" DIA cement lined Ductile Iron Riser pipe <br /> to 16" DIA Standard Weight Welded Steel pipe. And <br /> change the 8" DIA Dutile Iron Overflow pipe to 8" DIA <br /> Standard Weight'pipe. <br /> <br /> Total Dedect $2,700. <br /> <br /> Please review these proposed changes. The door must be decided <br /> quickly so CBI Na-Con can complete the design for the foundation. <br /> If you have any questions or need further assistance, please call. <br /> Thank you for your attention. <br /> <br />Very truly yours, <br /> <br />Daniel D. North <br />Contracting Engineer <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.