During Staff review of City streets as part of the 2023 Temporary Pavement Repairs Plan, it was noted the <br />segment of Alpine Drive between Trunk Highway 47 and Roanoke Street has several stretches with severe <br />potholes, across the width of the drive aisles. The current CIP has this stretch of Alpine Drive slated for street <br />reconstruction in 2030; however, Staff's opinion is that maintaining the street with only pot hole patching until <br />2030 is not realistic. Therefore, this project includes a 2-inch mill and overlay of the several pot hole areas, within <br />the drive aisles, of Alpine Drive between Trunk Highway 47 and Roanoke Street. By overlaying the drive aisles, <br />Staff feels they temporarily increase the drivability of Alpine Drive, and maintain the street until it's proposed <br />street reconstruction in 2030. Because the Highlands at River Park subdivision is adjacent to this segment of <br />Alpine Drive, mobilization costs will not be increased with this addition. The estimated project costs for the <br />Alpine Drive improvements, including 14-percent indirect costs is $45,521.12. These are proposed to be paid <br />through the budgeted funds for the temporary pavement repairs plan. <br />Build Process <br />• Install traffic control measures <br />o These are maintained throughout the project <br />• Project removals (spot curb and gutter, pedestrian ramps) <br />• Place new concrete curb and gutter and pedestrian ramps (5 to 7-day cure time) <br />• Mill existing pavement <br />• Finish structure adjustments, storm sewer catch basin repairs <br />• Restore the boulevard in any impacted areas <br />0 4 inches topsoil, turf <br />• Place new bituminous pavement <br />o Remove traffic control measures as allowed <br />Preliminary Schedule <br />• Staff Receives Bids <br />o April 21, 2023 <br />• Council Awards Contract to the lowest responsible bidder <br />o April 25, 2023 <br />• Contractor begins construction <br />o May 2023 <br />• Contractor Substantially Completes construction <br />o June 30, 2023 <br />• Contractor Final Completion (project clean up, punch list created) <br />o July 28, 2023 <br />The proposed improvements are designated as City Improvement #23-07, 2023 Neighborhood Pavement Overlay <br />Improvements. <br />Notification: <br />If Council accepts the bids and awards a contract for construction of the improvements, letters will be mailed to <br />property owners with updates on the project status. Engineering Staff maintains City Improvement webpages with <br />the most current project information, this can be found on the City website, Engineering department page. <br />Time Frame/Observations/Alternatives: <br />Alternative #1 — Motion to adopt Resolution #23-084 accepting bids and awarding contract for 2023 <br />Neighborhood Pavement Overlay Improvements, Improvement Project #23-07. <br />Alternative #2 — Motion of other. <br />Funding Source: <br />