My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/23/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 05/23/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2025 3:59:44 PM
Creation date
5/25/2023 11:39:30 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/23/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
327
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7, 7, <br />Meeting Date: 05/23/2023 <br />By: Bruce Westby, Engineering/Public Works <br />Information <br />Title: <br />Adopt Resolution #23-115 Accepting Bids and Awarding Contract for Improvement Project #23-14, 2023 <br />Critical Mill and Overlay Improvements <br />Purpose/Background: <br />The purpose of this case is to adopt Resolution #23-115 accepting bids and awarding a contract for construction <br />for Improvement Project #23-14, 2023 Critical Mill and Overlay Improvements. <br />During the 2023 budget process, the City Council authorized bonding approximately $12M for additional <br />Pavement Management Program projects over the next 10 years. The City Council also authorized budgeting an <br />additional $750,000 to the streets maintenance fund for temporary spray patching improvements on an estimated <br />19 miles of City streets that were not identified for overlay or reconstruction improvements in the 2022 - 2031 <br />Capital Improvement Program (CIP) but are exhibiting significant surface stripping damage. The bituminous <br />pavement on these streets is prone to accelerated deterioration due to water pooling in the surface depressions, <br />which is then forced between the pavement base and the wear courses as vehicle tires drop into the depressions <br />and push the water into pavement voids. The serviceability of these streets will therefore continue to decline <br />while other streets receive overlay and reconstruction improvements so Staff recommended spray patching the <br />estimated 19 miles of streets while PMP projects in the 2022 - 2031 CIP are completed, and until streets with <br />PASER ratings of 4 or less not included in the 2022-2031 CIP can be reconstructed. <br />Staff has since developed a detailed plan to hire contractors to perform various temporary pavement repair work <br />throughout the City in 2023 after observing that several different types of pavement repairs are needed to most <br />cost-effectively maintain pavement on streets awaiting overlay and reconstruction improvements. The different <br />types of pavement repairs recommended by Staff for 2023 include spray patching areas with surface stripping <br />damage, patching potholes deeper than 2-inches with hot mix asphalt, and completing 2-inch mill and overlay <br />improvements on areas with extensive pavement damage that result in significant calls for service and vehicle <br />damage claims. Pavement striping will also be needed in some areas after the contracted work is complete. <br />On April 25th the City Council approved plans and specifications prepared by the City Engineer and authorized <br />advertisements for bids for Improvement Project #23-14, Critical Mill and Overlay Improvements, that propose <br />2-inch mill and overlay improvements at 21 locations around the City with extensive pavement damage. <br />Bids were advertised in the Anoka County Union Herald on April 28, 2023, and May 5, 2023. Six (6) bids were <br />received, opened and tabulated on May 19, 2023, and the following bids were found to comply with the approved <br />plans and specifications and advertisements for bids. <br />Company Bid <br />T. A. Schifsky & Sons, Inc $569,118.04 <br />North Valley, Inc. $383,660.15 <br />Asphalt Surface Technologies Corp. $366,646.54 <br />GMH Asphalt Corp. $333,831.95 <br />Bituminous Roadways, Inc. $330,091.00 <br />Diversified Paving, Inc. $310,671.88 <br />Engineer's Estimate $267,606.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.