Laserfiche WebLink
EXHIBIT B <br />Fees Payable to the City <br />— .?e e otal Notes <br />Park Dedication and Trail Development <br />Park Dedication <br />0-12 Units per acre: or <br />-rai] Development <br />Residentai] <br />Subtotal and Trail Development <br />per unit <br />11 per unit <br />Fees satisfied in first addition <br />¢„500 $ 0 for entire subdivision <br />$16.500 <br />$16 500 <br />Water and Sewer Fees <br />Water Trunk (Connection) <br />Sanitary Sewer Trunk (Connection) <br />Subtotal Water and Sewer Fees <br />5tormwater Management Fees <br />per unit <br />per unit <br />Stormwater Management 11 per unit <br />Soobtotof Stormwater Management <br />Street Signs <br />Street Signs <br />Street Sign Subtotal <br />$2, 009 <br />$1,.349 <br />522.099 <br />14.839 <br />GRAND TOTAL FOR DEVELOPMENT FEES $60,537 <br />Sureties and Inspection Fees <br />PL.S.....,.,ance Surety (returned when complete) $347.361.45 cost of improvement 125% $43 i.202 Cash or Letter of Credit <br />Engineering Inspection Fee $347.361.45 cost of improvement 5 $17.368 Cash Escrow <br />Warranty for Stage I and ::::npro •ements $347,3151.45 cost of improvement 25$86.840 Cash or Letter of Credit Reduction <br />Sewer Acressibilit y charges (SAC) & Water Accessibility Charges A Collected with Building Permit <br />Accessibility Charge (1 AC) per SAC Unit $1,461 <br />Accessibility Charge (SAC) per SAC Unit $2,46 5 <br />GRAND TOTAL FOR SAC & WAC <br />$0 Collected with Building Permit <br />$0 Collected with Building Permit <br />$0 <br />1. Trail Development Fees. The PERMITTEE is responsible for satisfying applicable Trail <br />Development Fee requirements. PERMITTEE must pay a Trail Development Fee of $16,500.00 <br />(11 units x $1,500.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The <br />rate in effect when the Plat is recorded will be collected. <br />2. Sanitary Sewer Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying <br />applicable Sanitary Sewer Trunk Fee requirements. PERMITTEE must pay a Sanitary Sewer <br />Trunk Fee of $14,839.00 (11 units x $1,349.00). The PERMITTEE acknowledges that these fees <br />are estimates. The rate in effect when the Plat is recorded will be collected. <br />3. Water Connection (Trunk) Fees. The PERMITTEE is responsible for satisfying applicable Water <br />Trunk Fee requirements. PERMITTEE must pay a Water Trunk Fee of $22,099.00 (11 units x <br />$2,009.00 per unit). The PERMITTEE acknowledges that these fees are estimates. The rate in <br />effect when the Plat is recorded will be collected. <br />(continued on the next page) <br />12 <br />