Laserfiche WebLink
4. Stormwater Management Fee. The PERMITTEE is responsible for satisfying applicable <br />Stormwater Trunk Fee requirements. PERMITTEE must pay a Stormwater Management Fee <br />of $5,874.00 (11 units x $534.00 per unit). The PERMITTEE acknowledges that these fees are <br />estimates. The rate in effect when the Plat is recorded will be collected. <br />5. Street Sign Fee. While the CITY provides and installs the street name and traffic control signage, <br />the PERMITTEE is responsible for paying for them at a rate of $245 per sign. PERMITTEE <br />must pay a Street Sign Fee of $1,225.00 ($245 x 1 street name signs; $245 x 3 no parking signs; <br />$245 x 1 stop signs). <br />6. Development Fees for the Outlots. The PERMITTEE acknowledges that development fees are <br />not being collected for any Outlots. The PERMITTEE acknowledges that development fees will <br />be due upon development of any of the Outlots. The rate in effect at the time said future plat(s) <br />is recorded will be collected. <br />13 <br />