My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/13/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 06/13/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:19:11 AM
Creation date
6/13/2023 10:46:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/13/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
638
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7.3. <br />Meeting Date: 06/ 13/2023 <br />By: Bruce Westby, Engineering/Public Works <br />Information <br />Title: <br />Adopt Resolution #23-128 Accepting Bids and Awarding Contract for Improvement Project #23-17; COR Tree <br />Clearing <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-128 accepting bids and awarding a construction contract for <br />Improvement Project #23-17; COR Tree Clearing. <br />Background: <br />Attached is The COR Analysis Update and the COR Infrastructure Design Services Proposal, both prepared by <br />Bolton and Menk, Inc. <br />On February 21, 2023, the Public Works Committee (PWC) identified the following immediate COR <br />Infrastructure priorities; <br />• Grading, lining and installing storm sewer for the Waterfront stormwater pond, <br />• Filling low-lying COR properties using fill from the Waterfront pond excavation, <br />• Reconstructing Zeolite Street, <br />• Reconstructing and realigning the north end of Center Street, and <br />• Constructing Ramsey Parkway between the Sunwood Drive roundabout and Willemite Street. <br />The PWC felt the extension of Veterans Drive and the construction of Peridot Street were not a high priority at <br />the time. Minutes from this meeting are attached. <br />During the February 28, 2023, City Council work session, Council confirmed these priorities by consensus. <br />Minutes from this meeting are also attached. <br />Based on the identified priorities, Bolton and Menk, Inc. prepared the attached COR Infrastructure Design <br />Services Proposal to identify the associated scope of services and estimated costs required for design services, as <br />well as estimated construction costs. <br />Per the attached proposal, significant progress can be made in 2023 to achieve the identified priorities in the near <br />future. More specifically, in 2023 the following work can be completed; <br />• Grading, lining and installing storm sewer for the Waterfront stormwater pond, <br />• Filling low-lying COR properties using fill from the Waterfront pond excavation, <br />• Design and prepare plans and specifications for Zeolite Street, <br />• Design and prepare plans and specifications for the north end of Center Street, and <br />• Design and prepare plans and specifications for Ramsey Parkway between the Sunwood Drive roundabout <br />and Willemite Street. <br />The first step in this process is to remove unwanted trees from The COR to allow mass grading operations to <br />begin. <br />On May 9th, the City Council adopted Resolution #23-107 approving Bolton & Menk's COR Infrastructure <br />Design Services Proposal and authorizing advertisements for bids for Improvement Project #23-17, COR Tree <br />Clearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.