Laserfiche WebLink
Regular Planning Commission 6.3. <br />Meeting Date: 06/22/2023 <br />By: Chris Anderson, Community Development <br />Information <br />Title: <br />PUBLIC HEARING: Consider Bunker Lake Industrial Park 4th Addition Final Plat and Site Plan for BLIP <br />Building 5 (Project No. 23-106): Case of PSD LLC <br />Purpose/Background: <br />The City has received an application from PSD, LLC (the "Applicant") for review of a Final Plat for Bunker <br />Lake Industrial Park (BLIP) 4th Addition as well as a Site Plan for BLIP Building 5 for the property generally <br />located south of Bunker Lake Boulevard and east of Puma Street (the "Subject Property"). <br />Notification: <br />Staff attempted to notify property owners within 700 feet of the Subject Property, as reflected in the Anoka County Property <br />Records, of the request for final plat and site plan review, as well as the Public Hearing the Planning Commission would hold <br />on June 22, 2023. A notice of the Public Hearing was published in the Anoka County UnionHearld newspaper and a Land <br />Use Application sign was also placed on the Subject Property. <br />Observations/Alternatives: <br />General Project Overview <br />The Applicant is proposing to final plat the remainder of the BLIP land into two (2) lots, approximately eight (8) <br />acres and eleven (11) acres in size. An 84,000 square foot building is proposed to be constructed on Lot 1 <br />(western lot) currently, while building improvements on Lot 2 would likely occur no sooner than 2024 (a Site <br />Plan review will occur at that time). Site improvements, such as paving, curb and gutter, stormwater <br />management, etc. will be completed on both lots. The Applicant has indicated the probable uses will be offices <br />and manufacturing. <br />Zoning and Land Use <br />The Subject Property is zoned E-3 Employment District, as are the properties to the east, north/northeast, and <br />south/southeast. One parcel north of the Subject Property is zoned R-3 Residential (High Density) and the <br />properties to the west are zoned Planned Unit Development (PUD), with small lot single family residential homes <br />(Riverstone North). The E-3 Employment District includes offices and manufacturing as permitted uses. Both <br />lots meet all bulk standards prescribed for the E-3 District (lot size, lot width, setbacks, building coverage, etc.). <br />The Subject Property is guided as Business Park in the current Comprehensive Plan, as are the properties to the <br />east, north/northeast, and south/southeast. One property to the north is guided for high density residential (HDR) <br />and the properties to the west are guided for medium density residential (MDR). Lands guided as Business Park <br />are reserved for office and industrial development. <br />Building Design <br />The proposed building will be approximately thirty-six (36) feet in height (maximum building height allowed in <br />the E-3 Employment District is sixty-five [65] feet). The exterior finish of the building consists of precast <br />concrete wall panels of three (3) different colors, prefinished metal canopies over the various entrance points, <br />numerous windows on three (3) sides, and loading docks along the fourth (western) side. The trash enclosure will <br />consist of rockface concrete block colored to match the building and vertical composite wood siding. <br />Access, Parking and Maneuvering <br />There are a total of five (5) access points proposed, four (4) off of Bunker Lake Boulevard and one (1) off of <br />147th Lane. The Applicant has modified the plan in response to Staff comments such that the access points, <br />