Laserfiche WebLink
where feasible, line up with those on the north side of Bunker Lake Boulevard. The western two accesses off of <br />Bunker Lake Boulevard and the access off of 147th Lane will be constructed with Building 5; the eastern two <br />accesses will be constructed at the time Lot 2 is built. All pavement (1st and 2nd lifts) will be installed on Lot 1; <br />however, the portion of the access drive off of 147th Lane over Lot 2 will only receive the first lift as asphalt <br />initially (the second lift would be installed as part of the overall site improvements for Lot 2). Similarly, curb and <br />gutter will only be installed along the southern portion of Lot 2 initially, with the remainder installed with the <br />overall Lot 2 site improvements. <br />There are a total of 238 parking stalls that will be constructed as part of the initial site work. However, forty-four <br />(44) of those will ultimately serve the building(s) on Lot 2. Thus, there will be a total of 194 parking stalls for the <br />building on Lot 1. The plans provide a parking summary based on twenty percent (20%) office space and eighty <br />(80%) warehousing space. Based on that breakdown, a total of 123 stalls would be required (1 per 300 square feet <br />of office space and 1 per 1,000 square feet of warehousing space). <br />The maneuvering areas within the Subject Property will consist of areas with heavy duty asphalt (for truck traffic) <br />and areas of light duty asphalt (customer and employee parking areas). All maneuvering areas are setback at least <br />twenty (20) feet from public road right-of-way and at least sixty (60) feet from the adjacent residential area to the <br />west. <br />Landscaping <br />There will be a combination of trees and shrubs installed throughout the Subject Property. A mixture of tree <br />species will be planted about twenty-five (25) feet on center along the property boundary fronting Bunker Lake <br />Boulevard. The plans also call for trees to be installed between the infiltration pond and the south edge of the <br />pavement at a spacing of about thirty (30) feet on center. The plans were modified to diversify the shrub species <br />and to incorporate trees into the parking lot islands, which will help provide a modicum of shade for some of the <br />parking. <br />The Subject Property abuts several single family lots along the western boundary. When the Riverstone <br />development was constructed, it included a berm and tree plantings along the railroad tracks and then it curved <br />north between Riverstone and the Subject Property. The Applicant granted permission (and provided the berm <br />material) to have the berm constructed on the Subject Property to provide the bufferyard that would be required <br />between the two uses. The berm varies in height from about five (5) feet up to roughly ten (10) feet in spots and <br />includes about eighteen (18) existing trees, mostly evergreens with a few deciduous trees mixed in. The plans <br />include another seven (7) evergreen trees to be installed along this berm. Between the berm and the parking area <br />is a stormwater pond and additional plantings. There is a minimum of about 160 feet between the rear lot line of <br />the nearest residential lot and the parking area. The combination of the existing berm and trees, coupled with the <br />proposed plantings, as well as the additional separation provided by the stormwater pond, the bufferyard <br />requirement appears to be satisfied. <br />The Environmental Policy Board reviewed the natural resources aspects of this project and have recommended <br />approval. <br />Alternatives <br />Alternative 1: Recommend approval of the Site Plan and Final Plat contingent upon compliance with Staffs <br />review comments. The proposed lots, as well as the proposed use(s), comply with zoning code. This area was <br />part of the original preliminary plat for Bunker Lake Industrial Park and these two lots will complete this <br />industrial park. Staff supports this alternative. <br />Alternative 2: Recommend approval of the Site Plan and Final Plat with modifications. This action would be <br />based on discussion. <br />Alternative 3: Recommend denial of the Final Plat and Site Plan based on supporting findings of fact. As noted, <br />the Final Plat and Site Plan comply with City Code, contingent upon revisions per Staffs review comments. Staff <br />does not support this alternative. <br />