My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/27/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 06/27/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:20:14 AM
Creation date
6/26/2023 9:13:10 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/27/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1052001 <br />B. Immediate Notification. The County will notify the State District Engineer's authorized representative <br />immediately upon the contractor encountering contaminated soils and/or groundwater in areas that <br />are within the Project limits. The County will confer with the State as to the handling, disposal, and any <br />other issues related to contaminated materials found on State Right -of -Way or import of materials <br />onto State Right -of -Way. <br />C. Environmental Consultant. The County will provide for an Environmental Consultant to be on site to <br />observe and document the excavation, handling, and disposal of contaminated soils that have been <br />identified within the Project limits. If the contractor encounters contaminated materials in areas not <br />previously identified and upon notification by the County to the State, the County hired Environmental <br />Consultant will be provided to collect and analyze soil and/or groundwater samples to determine <br />contaminant levels, work with the landfill for disposal of the soil waste, and provide oversight of any <br />soil and groundwater handling and disposal. The County will not allow the contractor to excavate any <br />contaminated soil unless the Environmental Consultant is present. <br />3.7. Completion of Construction. The County will cause the contract construction to be started and completed <br />according to the time schedule in the construction contract special provisions. The completion date for the <br />contract construction may be extended, by an exchange of letters between the appropriate County official <br />and the State District Engineer's authorized representative, for unavoidable delays encountered in the <br />performance of the contract construction. <br />3.8. Plan Changes. The State will not participate in the cost of any contract construction that is in addition to <br />the State participation construction covered under this Agreement unless the following conditions have <br />been met: <br />A. The necessary State funds have been encumbered. <br />B. All changes in the Project Plans and all addenda, change orders, supplemental agreements, and work <br />orders entered into by the County and its contractor for State participation construction are approved <br />in writing by the State District Engineer's authorized representative. <br />3.9. Compliance with Laws, Ordinances, and Regulations. The County will comply and cause its contractor to <br />comply with all Federal, State, and Local laws, and all applicable ordinances and regulations. With respect <br />only to that portion of work performed on the State's Trunk Highway Right -of -Way, the County will not <br />require the contractor to follow local ordinances or to obtain local permits. <br />4. Right -of -Way; Easements; Permits <br />4.1. The County will obtain all rights -of -way, easements, construction permits, and any other permits and <br />sanctions that may be required in connection with the local and trunk highway portions of the contract <br />construction. Before payment by the State, the County will furnish the State with certified copies of the <br />documents for rights -of -way and easements, construction permits, and other permits and sanctions <br />required for State participation construction covered under this Agreement. <br />4.2. The County will convey to the State by quit claim deed, all newly acquired rights needed for the continuing <br />operation and maintenance of the Trunk Highway, if any, upon completion of the Project, at no cost or <br />expense to the State. <br />4.3. The County will comply with Minnesota Statutes § 216D.04, subdivision 1(a), for identification, notification, <br />design meetings, and depiction of utilities affected by the contract construction. <br />4.4. The City will submit to the State's Utility Engineer an original permit application for all utilities owned by <br />the City to be constructed upon and within the Trunk Highway Right -of -Way. Applications for permits will <br />be made on State form "Application for Utility Permit on Trunk Highway Right -of -Way" (Form 2525). <br />-4- <br />Payable Standard (Cooperative Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.