corridor, both of which would have significantly delayed the project. <br />This project does not propose to extend or replace any municipal utilities. Municipal watermain exists along the <br />north side of 167th Avenue between Quicksilver Street and Nowthen Boulevard. Sanitary sewer does not exist <br />within the project area. The City's 2040 Comprehensive Plan identifies a future MUSA Study Area for extending <br />trunk sanitary sewer to the 167th Avenue/Saint Francis Boulevard land use node. <br />Storm sewer improvements are required on the East end of 167th Avenue at Highway 47 to provide positive <br />drainage, which requires replacement of a significant portion of the existing curb and gutter. <br />These improvements are designated as City Improvement Project #23-04, 167th Avenue Reconstruction. <br />Attached is a copy of the construction plans as bid. <br />Notification: <br />Bids were advertised in the Anoka County Union Herald on Friday, May 26th, and Friday, June 2nd, 2023. <br />Time Frame/Observations/Alternatives: <br />Observations: <br />An Anoka County right-of-way permit for work occurring in CSAH 5 right-of-way has been received. One <br />condition of County approval was to remove two concrete pedestrian curb ramps on either side of CSAH 5 as <br />Anoka County does not allow uncontrolled pedestrian crosswalks on their high-speed highways (> 45 mph). It is <br />important to note that a roundabout is proposed for this intersection when grant funds are received. <br />Bolton and Menk is currently working on the following required approvals; <br />• U.S. Army Corps of Engineers — No loss for wetland impacts. Expected mid -July. <br />• Lower Rum River Watershed Management Organization — Stormwater permit application submitted. <br />• MnDOT Right -of -Way Permit — Applied for and expected soon. <br />No project delays are anticipated while working to obtain these required approvals. <br />Alternatives: <br />Alternative # 1: <br />Motion to adopt Resolution #23-148 accepting bids and awarding a contract for Improvement Project #23-04, <br />167th Avenue Reconstruction, and accepting Bolton and Menk's Construction Related Services Proposal. <br />Alternative #2: <br />Motion of other. <br />Funding Source: <br />A total of five (5) bids were received, <br />publicly opened and tabulated on June 20th, 2023, and the following bids <br />were found to comply with the approved plans and specifications and advertisements for bids. <br />Company <br />Bid <br />Asphalt Surface Technologies <br />$11511,455.59 <br />Corp. <br />North Valley, Inc. <br />$1,543,233.72 <br />Douglas -Kerr Underground, LLC 7 <br />$1,552,011.31 <br />Park Construction Company <br />$1,620,370.36 <br />Meyer Contracting Inc. <br />$118 06, 8 5 3.17 <br />Engineer's Estimate <br />71slY <br />392, 750.75 <br />The lowest responsible bid for construction costs was received from Asphalt Surface Technologies Corp. in the <br />