Laserfiche WebLink
Peat Removal & Granular Borrow Placement <br />800 Hitachi Excavator <br />D65PX Kumatsu Dozer <br /> <br />Subtotal <br />Equipment ,Labor & Material Markup @ 15% <br /> Total <br /> <br />Equipment Standby 4/7/06 thru 5/2/06 <br />800 Hitachi Excavator <br />D65PX Kumatsu Dozer <br />966 Loader Cat <br />Subtotal <br />Equipment ,Labor & Material Markup @ 15% <br /> Total <br /> <br />Dewatering Maintenance4/7/06 through 5/2/06 <br />Labor <br />Equipment ,Labor & Material Markup @ 15% <br /> Total <br /> <br />9.0 HR $ 280.00 <br />4.0 HR $ 148.00 <br />8.0 HR $ 162.00 <br /> <br />40.0 HR $ 164.50 <br />40.0 HR $ 72.10 <br />40.0 HR $ 67.20 <br /> <br />52 HR $ 69.15 <br /> <br />$ 2,520.00 <br />$ 592.00 <br />$ 1,296.00 <br />$ 4,408.00 <br />$ 661.20 <br />$ 5,069.20 <br /> <br />$ 6,580.00 <br />$ 2,884.OO <br />$ 2,688.00 <br />$ 12,152.00 <br />$ 1,822.8O <br />$ 13,974.80 <br /> <br />$ 3,595.80 <br />$ 539.37 <br />$ 4,135.17 <br /> <br />Materials <br /> <br />New 72" Manhole Base Sections <br />Equipment ,Labor & Material Markup @ 15% <br />Sales Tax @ 6.5% <br /> Total <br /> <br />Dewatering Inc. - Subcontractor Labor <br /> <br />Fuel & Labor 4/7/06 through 5/2/06 <br /> <br />Test Drilling <br /> <br />Outside Labor Markup @ 5% <br /> <br />Subtotal <br /> <br /> Total <br /> <br />Total Additional Labor, Equipment & Materials <br /> <br />5 EA $2,330.64 <br /> <br />1 LS $2,786.32 <br /> <br />1 LS $1,416.00 <br /> <br />$ 11,653.20 <br />$ 1,747.98 <br />$ 757.46 <br />$ 14,158.64 <br /> <br />$ 2,786.32 <br /> <br />$ 1,416.00 <br /> $ 4,202.32 <br /> $ 210.12 <br /> $ 4,412.44 <br /> <br />$ 47,727.37 <br /> <br />Total Additions I Deductions To Contract <br />Total Additional Labor, Equipment,& Materials <br />Grand Total of Change Order Cost <br /> <br />$ (33,546.03) <br />$ 47,727.37 <br />$ 14,181.34 <br /> <br />31 <br /> <br /> <br />