Laserfiche WebLink
Change Order No 1 <br />Date: May 10 2006 <br />Project: IP 03-20 NW Sanitary Sewer and Watermain Extension <br />Owner: City of Rarnsey <br />Contractor: LaTour Construction Inc <br /> <br />Description of Changes and Justification: <br /> <br />Upon initiating thc construction of the northwest sanitary sewer soil conditions were <br />encountered where organic soils were discovered to be deeper than the bottom of the <br />sanitary sewer. Thc Contractor was requested to perform soil testing for thc purpose of <br />determining a more economical alternate route for the sanitary sewer. An alternate route <br />located which reduced thc length of sanitary sewer by 264 feet. This change order <br />acknowledges the cost reduction as a result of this modification. The Contractor is <br />requesting compensation for one half of the dewatering costs incurred in placing <br />dewatcring points along a 671 foot length along the original sewer alignment, and also <br />compensation for fucl and manpower to check pumps while searching for an alternate <br />sewer route. Finally the contractor is requesting compensation for the removal of peat <br />between manholes A and B to facilitate dewatering. <br /> <br />Additions / Deductions to Contract <br /> <br />Item Description Quantity Unit Unit Cost Extension <br />7 Sanitary Sewer Dewatering 71.50 LF $ 111.25 $ 7,954.38 <br />25 Clearing 1.10 AC $ 4,680.00 $ 5,148.00 <br />26 Grubbing 1.10 AC $1,560.00 $ 1,716.00 <br /> <br />63 30" San Sewer (264.00) LF $ 156.60 $ (41,342.40) <br />65 San Sewer MN 48" (14.19) LF $ 200.00 $ (2,838.00) <br /> <br />66 San Sewer MN 72" (8.00) LF $ 523.00 $ (4,184.00) <br /> Subtotal $ (33,546.03) <br /> <br />Additional Labor, Equipment, and Materials <br /> <br />Description Quantity <br />Test Dril/ing on 4/24/06 & 4/27/06 <br />200 Kumatsu w/operator 17.5 <br />Laborer 17.5 <br />Foreman 17.5 <br /> Subtotal <br />Equipment ,Labor & Material Markup @ 15% <br /> Total <br /> <br /> Unit <br />Unit Cost <br /> <br />Extension <br /> <br />HR $ 162.00 $ 2,835.00 <br />HR $ 59.00 $ 1,032.50 <br />HR $ 76.00 $ 1,330.00 <br /> $ 5,197.50 <br /> $ 779.63 <br /> $ 5,977.13 <br /> <br />30 <br /> <br /> <br />