My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:21:10 AM
Creation date
7/17/2023 4:04:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
contract for construction on August 8th. Final completion of mass grading operations is proposed to be complete <br />by November 10, 2023. <br />Estimated costs for The COR Mass Grading, which includes excavation of The Waterfront stormwater pond, <br />stripping topsoil from properties proposed to receive fill from The Waterfront, documenting and compacting <br />underlying soils, distributing excavated fill material from The Waterfront to specified elevations, spreading <br />salvaged topsoil on the newly placed and compacted fill, and establishing turf, totals $ $7,509,215. The cost <br />breakout is as follows; <br />• $5,741,620 for Grading <br />• $1,499,530 for Storm sewer <br />• $112, 3 05 for Sanitary Sewer <br />• $155,730 for Watermain <br />Zeolite Street will remain closed to traffic during mass grading operations. <br />Design and plan preparation for the three segments of Zeolite Street, Center Street, and Ramsey Parkway is <br />underway and will be completed this fall. Street profiles were designed to set ground elevations along these <br />streets to allow for mass grading operations. The remainder of the design and plan preparation work will continue <br />to occur this Summer and Fall. Construction of these streets may then be completed in 2024 or later. <br />Notification: <br />Following Council approval, bid advertisements will be published in the Anoka Union Herald on Friday, July <br />14th, and Friday, July 21 st, 2023. <br />Observations/Alternatives: <br />Observations: <br />Staff verified that contractors are available to bid on and complete The COR mass grading project in 2023. <br />Funding Source: <br />The attached proposal from Bolton and Menk identifies the following not -to -exceed estimated costs. As noted on <br />page 5 of the attached proposal, costs will be less if individual projects are combined and constructed as larger <br />projects and not individually. <br />• Design services costs for all identified improvements = $548,181 <br />• Construction costs for identified 2023 improvements (not including streets and associated storm sewer, <br />sidewalks, trails, sanitary sewer and watermain) = $5,874,000 <br />Construction -related services such as staking, administration, and observation are not included in the above design <br />services cost estimate. When construction of the identified improvements occurs, a separate construction services <br />proposal will be submitted by BMI. <br />Proposed COR infrastructure project funding sources include; <br />. TIF 14 Bonds (street, sidewalk and trail costs) <br />. Stormwater Funds (stormwater management costs) <br />. Sanitary Sewer Funds (sanitary sewer costs) <br />. Watermain Funds (watermain costs) <br />Finance Director Lund and the City's financial consultant, Ehlers, recommend using tax increment bonds for the <br />approximate $7,000,000 in COR improvements, which includes the HY-10 Ramsey Improvements (excluding <br />municipal utilities) and the COR Infrastructure Improvements. Attached is a 15-year tax increment bond run <br />provided by Ehlers. According to Ehlers, the City will have the annual $640,000 needed to make the necessary <br />debt service payments due to increment generated by various developments within The COR. The 15-year bond <br />
The URL can be used to link to this page
Your browser does not support the video tag.