Laserfiche WebLink
Mr. Bruce Westby, P.E. <br />April 7, 2023 <br />Page 5of5 <br />Tree Preservation & Removals $3,740 <br />Roadway Layout, Alignment, and Grades $13,592 <br />Waterfront Configuration $12,556 <br />Wetland Impacts $5,454 <br />Lot Grading $5,320 <br />Stormwater Analysis & Strategy $11,830 <br />Right -of -Way Vacation & Platting $21,876 <br />Not -To -Exceed Fees $175,587 <br />Final Design Fees <br />Ramsey Parkway $116,816 <br />Zeolite Street $56,562 <br />Center Street $41,420 <br />Regional Stormwater Pond & Mass Grading $157,796 <br />Not -To -Exceed Fees $372,594 <br />The fees in the above tables, and included on the attached spreadsheets, represent not -to -exceed costs <br />if the projects are designed and constructed as individual projects. If two or more of the projects are <br />combined, savings would be realized for items such as specifications, bidding services, permitting and a <br />portion of the plan design. <br />Construction -related services such as staking, administration and observation are not included in this <br />proposal. A separate proposal can be submitted once the extent and timing of the improvements is <br />finalized. <br />If there are any questions or concerns, please call me at (651) 968-7760. <br />Sincerely, <br />Bolton & Menk, Inc. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />Attachments: <br />Figure 1— The COR Improvements <br />Figure 2 — Topographic Survey Services <br />Figure 3 — Stormwater Regional Pond and Mass Grading <br />Fee Spreadsheets <br />Braun Intertec Proposal for Geotechnical and Phase 1 ESA <br />C:\Users\kevinki\Desktop\COR Design 2023\New folder\Ramsey COR Area Design 04072023.docx <br />Bolton & Menk is an equat opportunity employer. <br />