My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:21:10 AM
Creation date
7/17/2023 4:04:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bolton & Menk, Inc. <br />Proposal QTB175606 <br />April 4, 2023 <br />Page 6 <br />We will determine the actual laboratory testing for the project depending on the encountered <br />subsurface conditions. If we identify a laboratory testing program that exceeds the budget included in <br />this proposal but provides additional value to the project, we will request authorization for the additional <br />fees through a Change Order. <br />Engineering Analyses <br />We will use data obtained from the subsurface exploration and laboratory tests to evaluate the <br />subsurface profile and groundwater conditions, and to perform engineering analyses related to structure <br />and pavement design and performance. <br />Geotechnical Report <br />We will prepare a report including: <br />■ A sketch showing the exploration locations. <br />■ Logs of the borings describing the materials encountered and presenting the results of our <br />groundwater measurements and laboratory tests. <br />■ A summary of the subsurface profile and groundwater conditions. <br />■ Discussion identifying the subsurface conditions that will impact design and construction. <br />■ Discussion regarding the reuse of on -site materials during construction. <br />■ Recommendations for preparing structure and pavement subgrades, and the selection, <br />placement and compaction of fill. <br />■ Recommendations of structure bearing capacities and assumed R-value for use in pavement <br />section design. <br />■ Recommendations for the design and construction of pavements and stormwater <br />improvements. <br />We will only submit an electronic copy of our report to you unless you request otherwise. At your <br />request, we can also send the report to additional project team members. <br />Schedule <br />Environmental Scope <br />We anticipate the draft Phase I ESA report will be completed within 2 to 3 weeks from the date of your <br />written authorization. The Phase I ESA report will remain in draft status until we are notified by you to <br />proceed with issuance of the final Phase I ESA report. <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.