My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:21:10 AM
Creation date
7/17/2023 4:04:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bolton & Menk, Inc. <br />Proposal QTB175606 <br />April 4, 2023 <br />Page 7 <br />If the proposed Scope of Services cannot be completed according to this schedule due to circumstances <br />beyond control, we will notify and discuss with you the revised schedule. <br />Geotechnical Scope <br />We anticipate performing our work according to the following schedule. <br />• Drill rig mobilization —within about 5 to 6 weeks following receipt of written authorization <br />• Field exploration —11 drilling days on site to complete the geotechnical borings <br />• Classification and laboratory testing —within 1 week after completion of field exploration <br />• Preliminary results — as samples are obtained and reviewed <br />• Draft report submittal —within about 4 weeks of after completion of field exploration <br />• Final report submittal — within 5 days of receiving comments on the draft report and <br />depending on the complexity of the comments <br />If we cannot complete our proposed scope of services according to this schedule due to circumstances <br />beyond our control, we may need to revise this proposal prior to completing the remaining tasks. <br />Fees <br />The costs for each of the tasks described in this proposal are as follows. <br />Service Description Cost <br />Task 1— Phase I Environmental Site Assessment <br />Professional Services $ 3,000 <br />Phase 1 ESA Estimated Subtotal $ 3,000 <br />Task 2 — Geotechnical Evaluation <br />Site Layout — Staking — Utility Coordination $ 2,950 <br />Drilling Services 49,500 <br />Geotechnical Laboratory Testing 6,025 <br />Engineering & Reporting 12,200 <br />Geotechnical Evaluation Estimated Subtotal $70,675 <br />Estimated Project Total $73,675 <br />BRAUN <br />INTERTEC <br />
The URL can be used to link to this page
Your browser does not support the video tag.