My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/11/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 07/11/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:21:10 AM
Creation date
7/17/2023 4:04:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/11/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
563
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. INTRODUCTION <br />The City of Ramsey has identified the need to prepare for further development of The COR. While much <br />of The COR has been developed, additional infill is anticipated in the near future. The purpose of this <br />analysis is to provide an update to the previous analysis, dated June of 2018, and determine the necessary <br />public infrastructure and associated costs required to allow the remaining, undeveloped portions of The <br />COR to develop. Additional analyses have supplemented the original report since 2018, including <br />geotechnical evaluations, Ramsey Parkway median alternatives, wetland delineations, and traffic counts. <br />Much of the information from the original report has been carried forward with this update. For <br />reference, the following figures and exhibits are contained in the appendix of this report: <br />Our analysis consists of three separate components that, when combined, provide an overview of the <br />study area needs: <br />• Preliminary Design Layouts — Provide graphical depictions of the public roadways and utilities, <br />• Preliminary Project Cost Estimates — Provides a baseline for fiscal planning of the <br />improvements, and <br />• Final Report — Describes required infrastructure improvements, layouts and costs. <br />For reference, the following figures and exhibits are contained in the appendix of this report: <br />• Appendix A includes a previously prepared Land Use Plan for The COR, along with roadway <br />related graphics from The COR Design Framework plan and City's Comprehensive Plan. <br />• Appendix B includes figures referenced throughout this study, <br />• Appendix C includes the geotechnical evaluation dated June 27, 2018, <br />• Appendix D includes the wetland delineation report, completed in October 2022. The delineation <br />is currently being reviewed by the Lower Rum River Watershed Management Organization <br />(LRRWMO), <br />• Appendix E includes the traffic counts collected in The COR in 2022, <br />• Appendix F includes previously conducted analyses within The COR Framework, and <br />• Appendix G includes The COR Tree Inventory Tabulation <br />II. PRELIMINARY DESIGN LAYOUTS, FIGURES AND EXHIBITS <br />To complete the analysis, existing conditions and proposed improvements were conceptually designed to <br />allow for estimating construction costs. The figures contained in Appendix B form the basis for much of <br />the analysis. The following list summarizes the figures contained in Appendix B: <br />• Figures 1-5: Study Area Layouts <br />• Figures 6-8: National Wetland Inventory & Mitigation Plan <br />• Figures 9-11: Public Utilities <br />• Figures 12-13: Site Grading & Drainage <br />• Figures 14: The Waterfront, Phase 1 Sketch <br />• Figures 15: The COR Area Tree Inventory <br />• Figures 16-18: The COR Roadway Typical Sections <br />Prepared by: Bolton & Menk, Inc. <br />The COR Analysis I OR1.129128 <br />INTRODUCTION <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.