Laserfiche WebLink
Probable Construction Costs <br />Waterfront Park - Main Area <br />TOTAL <br />ESTIMATED UNIT TOTAL <br />DIVISION DESCRIPTION QUANTITY UNITS COST COST <br />, GENERAL CONDITIONS 10% $ 487,500 <br />TESTING 1% $ 48,749.97 <br />8% CONSTRUCTION CONTINGENCY 8% $ 390,000 <br />TOTAL ESTIMATED CONSTRUCTION COSTS $ 5,801,200 <br />PERMITS/BONDS/INSURANCE 3% $ 174,000 <br />DESIGN FEES 12% $ 696,100 <br />I TOTAL PROJECT COSTS $ 6,671,300 I <br />