Laserfiche WebLink
Probable Construction Costs <br />Waterfront Park - Outer Area <br />TOTAL <br />ESTIMATED <br />DIVISION DESCRIPTION QUANTITY <br />GENERAL REQUIREMENTS <br />EARTHWORK <br />UNITS <br />UNIT <br />COST <br />MOBILIZATION (3%) 1 LUMP $ 33,000.00 <br />COMMON EXCAVATION 3 255 CU YD $ 20.00 <br />SLOPE PROTECTION 723 SQ YD $ 8.50 <br />SELECT GRANULAR BORROW AND ROUGH GRADING 3 255 CU YD $ 25.00 <br />TOPSOIL BORROW AND ARCHITECTURAL GRADING 160.185 185 CU YD $ 30.00 <br />TOTAL <br />COST <br />, $ 33,000 <br />$ 33,000 <br />$ 157,433 <br />$ 65,102 <br />$ 6,148 <br />$ 81,378 <br />$ 4,806 <br />CONCRETE WALKS AND STREET $ 237,671 <br />DETECTABLE CURB RAMPS 9 EA $ 1,500.00 $ 13,500 <br />4" CONCRETE WALK 15 200 SF $ 6.00 $ 91,200 <br />BITUMINOUS TRAILS 4 543 LF $ 4.00 $ 18,172 <br />AGGREGATE BASE 955 CY $ 22.00 $ 20,999 <br />BOARDWALKS/DOCK 1340 LF $ 70.00 $ 93,800 <br />FOUNTAINS <br />ARCHITECTURE <br />STAIRS AND WALLS $ <br />FENCE/SCREEN $ <br />FURNISHING $ 113,000 <br />KIOSK (ARTFUL STRUCTURE, PARK SIGN AND INTERPRETIVE SIGN) 2 EA $ 15,000.00 $ 30,000 <br />RECEPTACLES 8 EA $ 1,500.00 $ 12,000 <br />BENCHES 12 EA $ 2,500.00 $ 30,000 <br />BIKE RACKS 4 EA $ 1,500.00 $ 6,000 <br />DRINKING FOUNTAIN 1 EA $ 5,000.00 $ 5,000 <br />PICNIC TABLES 10 EA $ 3,000.00 $ 30,000 <br />PLAY EQUIPMENT EA $ 50,000.00 $ <br />LIGHTING $ 216,000 <br />PEDESTRIAN POLE LIGHTS 120 EA $ 1,800.00 $ 216,000 <br />STORMWATER RE -USE AND TREATEMENT $ <br />GENERAL PLANTING $ 524,961 <br />TREES 100 EA 500.00 50,000.00 <br />SM TREES 0 EA 400.00 <br />PLANTING SOIL 5333 CY 30.00 159,990.00 <br />PERENNIALS/SHRUBS 8650 SF 8.00 69,200.00 <br />NATIVE SEEDING W/ PLUGS 1.7 ACRE 5000.00 8,500.00 <br />KAME & DRUMLIN AREA NATIVE SEEDING W/ PLUGS 0.7 ACRE 5000.00 3,500.00 <br />KAME & DRUMLIN SOD 6350.0 SY 8.00 50,800.00 <br />SOD 1265 SY 8.00 10,120.00 <br />IRRIGATION 86351 SF 1.00 86,351.00 <br />ALUMINUM EDGING 0 LF 8.00 <br />MULCH W FABRIC 8650 SY 10.00 86,500.00 <br />UTILITIES <br />STORM, WATER, POWER <br />1 LUMP $50,000.00 $ 50,000 <br />' ESTIMATED CONSTRUCTION COSTS $ 1,332,066 <br />10% DESIGN CONTINGENCY 10% $ 133,300 <br />ESTIMATED CONSTRUCTION COSTS $ 1,465,366 <br />