My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/25/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 07/25/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:23:07 AM
Creation date
7/26/2023 1:25:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/25/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work that RPR believes should be corrected or rejected or should be uncovered for observation, or <br />requires special testing, inspection or approval. <br />(c) Determine if tests, equipment and systems startups and operating and maintenance training are <br />conducted in the presence of appropriate personnel, and that Contractor maintains adequate <br />records thereof; and observe, record and report to Consultant appropriate details relative to the test <br />procedures and startups. <br />(d) Accompany visiting inspectors representing the public or other agencies having jurisdiction over the <br />Project, record the results of these inspections and report to Consultant. <br />6. Interpretation of Contract Documents: Report to Consultant when clarification and interpretations of the <br />Contract Documents are requested by contractor and transmit to contractor clarifications and <br />interpretations as issued by Consultant. <br />7. Modifications: Consider and evaluate contractor's suggestions for modifications in drawings or <br />specifications and report with RPR's recommendations to Consultant. Transmit decisions to contractor <br />as issued by Consultant. <br />8. Records: <br />(a) Maintain at the job site orderly files for correspondence, reports of job conferences, shop drawings <br />and samples, reproductions of original Contract Documents including all addenda, change orders, <br />field orders, additional drawings issued subsequent to the execution of the construction contract, <br />Consultant's clarifications and interpretations of the Contract Documents, progress reports, and <br />other related documents. <br />(b) Keep a diary or logbook, recording contractor hours on the job site, weather conditions, data relative <br />to questions of change orders, or changed conditions, list of job site visitors, daily activities, <br />decisions, observations in general, and specific observations in more detail as in the case of <br />observing test procedures; and send copies to Consultant. <br />(c) Record names, addresses and telephone numbers of all contractors, subcontractors and major <br />suppliers of materials and equipment. <br />9. Reports: <br />(a) Furnish Consultant periodic reports as required of progress of the Work and of contractor's <br />compliance with the progress schedule and schedule of shop drawing and sample submittals. <br />(b) Consult with Consultant in advance of scheduled major tests, inspections or start of important <br />phases of the Work. <br />(c) Draft proposed change orders and Work, obtaining backup material from contractor and <br />recommend to Consultant change orders, and field orders. <br />(d) Report immediately to Consultant and Client upon the occurrence of any accident. <br />10. Payment Requests: Review applications for payment with contractor for compliance with the established <br />procedure for their submission and forward with recommendations to Consultant, noting particularly the <br />relationship of the payment requested to the schedule of values, Work completed, and materials and <br />equipment delivered at the site but not incorporated in the Work. <br />11. Certificates, Maintenance and Operation Manuals: During the course of the Work, verify that certificates, <br />maintenance and operation manuals and other data required to be assembled and furnished by <br />contractor are applicable to the items actually installed and in accordance with the Contract Documents, <br />and have this material delivered to Consultant for review and forwarding to Client prior to final payment <br />for the Work. <br />12. Completion: <br />(a) Before Consultant issues a certificate of substantial completion, submit to contractor a list of <br />observed items requiring completion or correction. <br />(b) Conduct final inspection in the company of Consultant, Client, and contractor and prepare a final list <br />of items to be completed or corrected. <br />(c) Observe that all items on the final list have been completed or corrected and make <br />recommendations to Consultant concerning acceptance. <br />Short Elliott Hendrickson Inc. <br />Letter Agreement - 5 City of Ramsey <br />(Rev. 11.08.18aa) <br />
The URL can be used to link to this page
Your browser does not support the video tag.