My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/25/2023
Ramsey
>
Public
>
Agendas
>
Council
>
2023
>
Agenda - Council - 07/25/2023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2025 11:23:07 AM
Creation date
7/26/2023 1:25:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/25/2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
219
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. 1. <br />CC Regular Session <br />Meeting Date: <br />07/25/2023 <br />Primary Strategic Plan Initiative: Address infrastructure needs. <br />Information <br />Title: <br />Adopt Resolution #23-169 Accepting Bids and Awarding Contract for 2023 MSA Pavement Overlay <br />Improvements, Improvement Project #23-06 <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #23-169 accepting bids and awarding contract for 2023 MSA <br />Pavement Overlay Improvements, Improvement Project #23-06. <br />Background: <br />City Improvement Project #23-06 proposes to mill and overlay Municipal State Aid (MSA) street Riverdale <br />Drive between Ramsey Boulevard and Feldspar Street, as well as the Rivenwick 3rd and Rivenwick Village <br />subdivision. The streets are urban section with concrete curb and gutter. Riverdale Drive is 40 feet wide with <br />12-foot drive lanes and 8-foot parking lanes. The streets within the two subdivisions are 31 feet wide. The streets <br />total 1.26 miles in length, a street segment summary is attached to this case for reference. <br />Project History <br />• 2023 — 2032 Capital Improvement Program — listed Riverdale Drive as an overlay for 2023. Rivenwick 3rd <br />& Rivenwick Village listed as an overlay for 2025 <br />• Resolution #22-250 adopted November 7, 2022, City Council accepted proposal for topographic survey <br />• November 15, 2022, Public Works Committee recommended City Council order plans and specifications <br />• Resolution #22-287 adopted December 13, 2022, City Council ordered plans and specifications <br />• April 18, 2023, Public Works Committee recommended City Council add the streets within Rivenwick 3rd <br />and Rivenwick Village to Improvement Project #23-06 <br />• Resolution #23-083 adopted April 25, 2023, City Council amended the scope of Improvement Project <br />#23-06 to include the streets within Rivenwick 3rd and Rivenwick Village <br />• June 20, 2023, Public Works Committee recommended City Council approve plans and specifications and <br />authorize advertisement for bids <br />• Resolution #23-141 adopted June 27, 2023, City Council approved plans and specifications and authorized <br />advertisement for bids <br />Pavement History <br />The streets within the project area were built between 1992 (Riverdale Drive between Garnet Street and Feldspar <br />Street) and 2003/2004. Pavement maintenance has included 2 rounds of crack seal / seal coat improvements, with <br />all street segments receiving treatments in 2018. Until recently only minor street patching has been required. <br />2021 PASER values were 8 for all street segments, and the street base seems to be in good condition. <br />Ground Penetrating Radar (GPR) was performed on Riverdale Drive, finding an average of 4.0 inches of <br />bituminous pavement. Rivenwick 3d and Rivenwick Village as -built drawings show an existing pavement <br />thickness of 3.5 inches. The GPR summary is included in the attached street segment summary. <br />Proposed Improvements <br />Based on Staff review of the existing pavement sections, and condition of the existing pavements, a mill and <br />
The URL can be used to link to this page
Your browser does not support the video tag.