overlay of the existing pavement is appropriate. The proposed mill and overlay will be 2-inches thick throughout <br />the project area. <br />Staff review found the existing pedestrian ramps within the project area did not meet current ADA requirements, <br />therefore all pedestrian ramps within the project area will need to be removed and replaced. The concrete curb <br />and gutter along Riverdale Drive was found to be in very poor condition. Due to the amount of curb that would <br />require replacement, and Staff's expectation that the curb and gutter will be serviceable for 15 to 20 years until a <br />full street reconstruction will occur, this project is proposing to focus efforts on the pavement and not perform <br />curb and gutter repairs beyond what is necessary for installing the ADA compliant pedestrian ramps. The <br />concrete curb and gutter within the Rivenwick 3-d and Rivenwick Village subdivisions was found to generally be <br />in good condition, and only spot repairs are proposed. <br />Minor repairs to the existing storm sewer structures are proposed with this project, the majority of which are <br />grouting the existing adjustment rings and pipe inverts. Some storm sewer catch basins will require resetting due <br />to settling. <br />The sanitary sewer castings along Riverdale Drive were found to be an older, heavier model no longer installed <br />within the City. At the request of the Utilities Department, Staff is proposing to replace the 14 castings along <br />Riverdale Drive to the currently specified model. <br />Preliminary Schedule Remaining <br />• Council Awards Contract to the lowest responsible bidder <br />o July 25, 2023 <br />• Contractor begins construction <br />o August 2023 <br />• Contractor Substantially Completes construction <br />o September 29, 2023 <br />• Contractor Final Completion (verify final restoration, punch list created) <br />o October 13, 2023 <br />State Aid Approval <br />The plans and specifications have received MnDOT State Aid approval. The construction costs and indirect costs <br />for work within the Riverdale Drive right of way are eligible state aid funds, except for any sanitary sewer or <br />watermain construction costs. <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical sections, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Notification: <br />If Council accepts the bids and awards a contract for construction of the improvements, letters will be mailed to <br />property owners with updates on the project status. Engineering Staff maintains City Improvement webpages with <br />the most current project information, this can be found on the City website, Engineering department page. <br />Time Frame/Observations/Alternatives: <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #23-169 accepting bids and awarding contract for 2023 MSA <br />Pavement Overlay Improvements, Improvement Project #23-06. <br />Alternative #2 — Motion of other. <br />