Laserfiche WebLink
authorized advertisement for bids. <br />Proposed Improvements: <br />Based on direction from the Park & Recreation Commission, Public Works Committee, and City Council, this <br />project proposes to reconstruct the parking lot with; two-way traffic flow, two lowered medians which will both <br />collect stormwater runoff and contain trees to provide shade, and an increased foot print to allow for more parking <br />stalls while not removing any mature trees within the park. The parking lot will include B-style concrete curb and <br />gutter throughout, with concrete flumes in the medians. A storm sewer system including catch basins and pipe <br />will be installed at low points in the park drive and medians to take the stormwater runoff. This storm sewer will <br />connect to the stormwater system built as part of the 161 st Avenue reconstruction project. The parking lot stalls <br />are proposed to be 20 feet deep and 9 feet wide with 24 feet wide drive aisles. The total stall count is 232, <br />including 7 handicap stalls. Handicap stall counts are required per the Minnesota Accessibility code, which <br />requires a minimum 7 stalls for total spaces between 201 and 300. <br />Staff is proposing to not include the median landscaping or irrigation system as part of the parking lot <br />reconstruction. This is proposed to be performed separately later this Fall. As part of the parking lot <br />reconstruction, conduit will be added for future connection to the existing park irrigation system. <br />Future Central Park Considerations: <br />This project is proposing to only reconstruct the main parking lot and adjacent park drives. The smaller southern <br />parking lot is being reconstructed as part of the 161 st Avenue reconstruction project per City Council direction on <br />December 13, 2022. The parking lot bay across from the hockey rinks and park drive are in the same condition <br />and age as the main parking lot. Construction of these facilities is proposed to be phased to allow for continual use <br />of Central Park by the public. To offset parking loss during fall sports and provide additional parking during the <br />parking fair, City Staff has temporarily stripped the hockey rinks and pleasure rink for parking. An exhibit <br />showing this layout is attached to this case. <br />Preliminary Schedule Remaining: <br />• Staff Receives Bids <br />o August 18, 2023 <br />• Council awards contract to the lowest responsible bidder <br />o August 22, 2023 <br />• Contractor begins construction <br />o September, 2023 <br />• Contractor substantially completes construction <br />o October 13, 2023 <br />• Landscaping / Irrigation installation <br />o October / November 2023 <br />Bid Opening: <br />Staff proposes to open bids on August 18, 2023, and to present the bid results to City Council on August 22, <br />2023 for award of a construction contract to the lowest responsible bidder. <br />Final plans are not attached to this case to prevent potential bidders from downloading plans attached to the case <br />to prepare and submit their bids, rather than purchasing the plans through QuestCDN, the electronic bidding <br />software used by the City of Ramsey. This ensures all bidders are bidding off the same set of plans, and all <br />bidders are notified of any plan revisions (addenda) issued during the bidding process. Attached is the title sheet <br />showing the scope of the improvements, as well as a plan sheet showing the typical sections, which includes <br />information on the proposed pavement section. Plans are available upon request from the City Engineer. <br />Notification: <br />None required for this case. <br />